| Total Changes for the Spring Budget Revision | Operating | Capital | Total | |
|---|---|---|---|---|
| £m | £m | £m | ||
| Total Budget following the Autumn Budget Revision | 6,526.915 | 135.708 | 6,662.624 | |
| Changes Proposed | Funding Changes | 55.413 | 17.850 | 73.263 |
| Technical Adjustment | -26.852 | 5.833 | -21.019 | |
| Net Whitehall Transfers | 9.232 | 0.000 | 9.232 | |
| Net Transfers within Scottish Block | -49.589 | 0.000 | -49.589 | |
| Total changes proposed | -11.796 | 23.683 | 11.887 | |
| Proposed Budget following Spring Budget Revision | 6,515.119 | 159.391 | 6,674.510 | |
| Expenditure Limit | Third Sector | 21.436 | 0.000 | 21.436 |
| Housing and Building Standards | 571.158 | 74.302 | 645.460 | |
| Cladding | 10.811 | 0.000 | 10.811 | |
| Tackling Child Poverty and Social Justice | 43.677 | 0.000 | 43.677 | |
| Connected Communites | 92.245 | 0.000 | 92.245 | |
| Social Security | 440.226 | 85.089 | 525.315 | |
| Social Security Assistance | 5,154.204 | 0.000 | 5,154.204 | |
| Equalities, Inclusion and Human Rights | 47.647 | 0.000 | 47.647 | |
| Ukrainian Resettlement | 148.754 | 0.000 | 148.754 | |
| Migration Strategy | 2.697 | 0.000 | 2.697 | |
| Total Expenditure Limit | 6,532.855 | 159.391 | 6,692.246 | |
| UK Funded AME | Social Security (AME) | -17.736 | 0.000 | -17.736 |
| Total UK Funded AME | -17.736 | 0.000 | -17.736 | |
| Other Expenditure | Total Onther Expediture | 0.000 | 0.000 | 0.000 |
| Total Budget | 6,515.119 | 159.391 | 6,674.510 | |
| Total Limit on Income (accruing resources) | 90.000 | |||
Schedule 3.1 Third Sector
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 21.768 | 0.000 | 21.768 |
| ABR changes | -0.196 | 0.000 | -0.196 |
| ABR Budget | 21.572 | 0.000 | 21.572 |
| Proposed changes | -0.136 | 0.000 | -0.136 |
| SBR Proposed Budget | 21.436 | 0.000 | 21.436 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Miscellaneous minor transfers | -0.136 | 0.000 | -0.136 |
| -0.136 | 0.000 | -0.136 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 21.436 | 0.000 | 21.436 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 21.436 | 0.000 | 21.436 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Third Sector | 21.436 | 0.000 | 21.436 |
| Net Expenditure | 21.436 | 0.000 | 21.436 |
Schedule 3.2 Housing
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 654.867 | 68.300 | 723.167 |
| ABR changes | -73.876 | 0.000 | -73.876 |
| ABR Budget | 580.991 | 68.300 | 649.291 |
| Proposed changes | -27.569 | 6.002 | -21.567 |
| SBR Proposed Budget | 553.422 | 74.302 | 627.724 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| AME Budget reflecting changes in the valuation of Shared Equity Investments and outstanding loans | -17.736 | 0.000 | -17.736 |
| Technical adjustment between direct to indirect capital to show correct split of capital receipts | -6.002 | 6.002 | 0.000 |
| Transfer from Tackling Child Poverty and Social Justice to support the Fuel Insecurity Fund | 5.000 | 0.000 | 5.000 |
| Transfer from Local Government to fund the Building Standards Division | 1.500 | 0.000 | 1.500 |
| Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -10.300 | 0.000 | -10.300 |
| Miscellaneous minor transfers | -0.031 | 0.000 | -0.031 |
| -27.569 | 6.002 | -21.567 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 553.422 | 74.302 | 627.724 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 553.422 | 74.302 | 627.724 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| More Homes | 479.680 | 74.302 | 553.982 |
| Housing Support | 43.570 | 0.000 | 43.570 |
| Fuel Poverty/Energy Efficiency | 27.077 | 0.000 | 27.077 |
| Building Standards | 3.095 | 0.000 | 3.095 |
| Net Expenditure | 553.422 | 74.302 | 627.724 |
Schedule 3.3 Cladding
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 29.717 | 0.000 | 29.717 |
| ABR changes | -0.023 | 0.000 | -0.023 |
| ABR Budget | 29.694 | 0.000 | 29.694 |
| Proposed changes | -18.883 | 0.000 | -18.883 |
| SBR Proposed Budget | 10.811 | 0.000 | 10.811 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -18.977 | 0.000 | -18.977 |
| Miscellaneous minor transfers | 0.094 | 0.000 | 0.094 |
| -18.883 | 0.000 | -18.883 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 10.811 | 0.000 | 10.811 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 10.811 | 0.000 | 10.811 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Cladding | 10.811 | 0.000 | 10.811 |
| Net Expenditure | 10.811 | 0.000 | 10.811 |
Schedule 3.4 Tackling Child Poverty and Social Justice
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 52.934 | 0.000 | 52.934 |
| ABR changes | -0.808 | 0.000 | -0.808 |
| ABR Budget | 52.126 | 0.000 | 52.126 |
| Proposed changes | -8.449 | 0.000 | -8.449 |
| SBR Proposed Budget | 43.677 | 0.000 | 43.677 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Transfer to Housing to support the Fuel Insecurity Fund | -5.000 | 0.000 | -5.000 |
| Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -3.717 | 0.000 | -3.717 |
| Transfer from Lifelong Learning and Skills to support delivery of MCR Pathways school-based mentoring programme | 1.000 | 0.000 | 1.000 |
| Miscellaneous minor transfers | -0.732 | 0.000 | -0.732 |
| -8.449 | 0.000 | -8.449 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 43.677 | 0.000 | 43.677 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 43.677 | 0.000 | 43.677 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Communities Analysis | 7.666 | 0.000 | 7.666 |
| Social Justice | 36.011 | 0.000 | 36.011 |
| Net Expenditure | 43.677 | 0.000 | 43.677 |
Schedule 3.5 SJ Central Government Grants to Local Authorities
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 92.245 | 0.000 | 92.245 |
| ABR changes | 0.000 | 0.000 | 0.000 |
| ABR Budget | 92.245 | 0.000 | 92.245 |
| Proposed changes | 0.000 | 0.000 | 0.000 |
| SBR Proposed Budget | 92.245 | 0.000 | 92.245 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Miscellaneous minor transfers | 0.000 | 0.000 | 0.000 |
| 0.000 | 0.000 | 0.000 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 92.245 | 0.000 | 92.245 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 92.245 | 0.000 | 92.245 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Transfer of the Management of Development Funding | 92.245 | 0.000 | 92.245 |
| Net Expenditure | 92.245 | 0.000 | 92.245 |
Schedule 3.6 Social Security
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 458.470 | 67.200 | 525.670 |
| ABR changes | -0.131 | 0.208 | 0.077 |
| ABR Budget | 458.339 | 67.408 | 525.747 |
| Proposed changes | -18.113 | 17.681 | -0.432 |
| SBR Proposed Budget | 440.226 | 85.089 | 525.315 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Additional funding to Social Security Programme Costs | 0.000 | 17.850 | 17.850 |
| Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -5.500 | 0.000 | -5.500 |
| Transfer from Social Security for Scottish Disability Assistance - Child Disability Payment | -4.584 | 0.000 | -4.584 |
| Transfer to Local Government in relation to Scottish Welfare Fund | -5.473 | 0.000 | -5.473 |
| Technical adjustment of non-cash budget for depreciation | -2.900 | 0.000 | -2.900 |
| Transfer to Scottish Courts and Tribunal Service in relation to First-tier Tribunal for Scotland Social Security Chamber funding | -1.221 | 0.000 | -1.221 |
| Miscellaneous minor transfers | 1.565 | -0.169 | 1.396 |
| -18.113 | 17.681 | -0.432 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | -57.190 | 85.089 | 27.899 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 497.416 | 0.000 | 497.416 |
| 440.226 | 85.089 | 525.315 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Social Security Scotland | 275.246 | 3.539 | 278.785 |
| Social Security Advice Policy and Programme Costs | 164.980 | 81.550 | 246.530 |
| Scottish Welfare Fund Administration | 0.000 | 0.000 | 0.000 |
| Social Security (AME) | 0.000 | 0.000 | 0.000 |
| Net Expenditure | 440.226 | 85.089 | 525.315 |
Schedule 3.7 Social Security Assistance
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 5,137.900 | 0.000 | 5,137.900 |
| ABR changes | 0.000 | 0.000 | 0.000 |
| ABR Budget | 5,137.900 | 0.000 | 5,137.900 |
| Proposed changes | 16.304 | 0.000 | 16.304 |
| SBR Proposed Budget | 5,154.204 | 0.000 | 5,154.204 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Additional funding for net movement in Social Security benefit expenditure forecasts | 51.804 | 0.000 | 51.804 |
| Transfer to Local Government to supply support to local authorities to provide the Scottish Welfare Fund | -35.500 | 0.000 | -35.500 |
| 16.304 | 0.000 | 16.304 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 5,154.204 | 0.000 | 5,154.204 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 5,154.204 | 0.000 | 5,154.204 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Personal Independence Payment | 2,646.044 | 0.000 | 2,646.044 |
| Attendance Allowance | 659.940 | 0.000 | 659.940 |
| Scottish Child Payment | 426.841 | 0.000 | 426.841 |
| Disability Living Allowance (Adult) | 443.856 | 0.000 | 443.856 |
| Carer's Allowance | 359.136 | 0.000 | 359.136 |
| Child Disability Assistance (DLA Child and DACYP) | 400.895 | 0.000 | 400.895 |
| Industrial Injuries Disablement Scheme | 83.950 | 0.000 | 83.950 |
| Carer's Allowance Supplement | 47.900 | 0.000 | 47.900 |
| Scottish Welfare Fund | 0.000 | 0.000 | 0.000 |
| Low Income Winter Heating Assistance | 22.126 | 0.000 | 22.126 |
| Best Start Grant | 21.832 | 0.000 | 21.832 |
| Best Start Food Grant | 14.029 | 0.000 | 14.029 |
| Funeral Support Payment | 12.917 | 0.000 | 12.917 |
| Severe Disablement Allowance | 5.688 | 0.000 | 5.688 |
| Child Winter Heating Allowance | 7.249 | 0.000 | 7.249 |
| Job Start Payment | 0.352 | 0.000 | 0.352 |
| Young Carer Grant | 1.449 | 0.000 | 1.449 |
| Net Expenditure | 5,154.204 | 0.000 | 5,154.204 |
Schedule 3.8 Equalities, Inclusion and Human Rights
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 52.937 | 0.000 | 52.937 |
| ABR changes | -4.091 | 0.000 | -4.091 |
| ABR Budget | 48.846 | 0.000 | 48.846 |
| Proposed changes | -1.199 | 0.000 | -1.199 |
| SBR Proposed Budget | 47.647 | 0.000 | 47.647 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -1.000 | 0.000 | -1.000 |
| Miscellaneous minor transfers | -0.199 | 0.000 | -0.199 |
| -1.199 | 0.000 | -1.199 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 47.647 | 0.000 | 47.647 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 47.647 | 0.000 | 47.647 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Equalities, Inclusion and Human Rights | 47.647 | 0.000 | 47.647 |
| Net Expenditure | 47.647 | 0.000 | 47.647 |
Schedule 3.9 Ukrainian Resettlement
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 72.292 | 0.000 | 72.292 |
| ABR changes | 29.979 | 0.000 | 29.979 |
| ABR Budget | 102.271 | 0.000 | 102.271 |
| Proposed changes | 46.482 | 0.000 | 46.482 |
| SBR Proposed Budget | 148.753 | 0.000 | 148.753 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Transfer to Local Government to support Ukrainian Ressettlement | -3.200 | 0.000 | -3.200 |
| Transfers from Tackling Child Poverty and Social Justice in relation to Ukrainian Resettlement | 3.526 | 0.000 | 3.526 |
| Additional funding in relation to Ukrainian Resettlement | 37.700 | 0.000 | 37.700 |
| Whitehall transfer in relation to Ukrainian Resettlement (thank you payment) | 8.074 | 0.000 | 8.074 |
| Miscellaneous minor transfers | 0.382 | 0.000 | 0.382 |
| 46.482 | 0.000 | 46.482 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 148.754 | 0.000 | 148.754 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 148.754 | 0.000 | 148.754 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Ukrainian Resettlement | 148.754 | 0.000 | 148.754 |
| Net Expenditure | 148.754 | 0.000 | 148.754 |
Schedule 3.10 Migration Strategy
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Original Budget | 0.000 | 0.000 | 0.000 |
| ABR changes | 2.931 | 0.000 | 2.931 |
| ABR Budget | 2.931 | 0.000 | 2.931 |
| Proposed changes | -0.234 | 0.000 | -0.234 |
| SBR Proposed Budget | 2.697 | 0.000 | 2.697 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Miscellaneous minor transfers | -0.234 | 0.000 | -0.234 |
| -0.234 | 0.000 | -0.234 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Gross Expenditure | 2.697 | 0.000 | 2.697 |
| Less: Retained Income | 0.000 | 0.000 | 0.000 |
| Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
| 2.697 | 0.000 | 2.697 |
| Proposed Changes | Operating | Capital | Total |
|---|---|---|---|
| £m | £m | £m | |
| Migration Strategy | 2.697 | 0.000 | 2.697 |
| Net Expenditure | 2.697 | 0.000 | 2.697 |