Building regulations - fire safety and compliance call for evidence: analysis of responses
This analysis of consultation responses will help inform Scottish Government policy decisions in response to the Grenfell Tower Inquiry Phase 2 recommendations, including wider changes to Scottish Building Standards, fire safety regulations and guidance, and the compliance plan approach.
2. Review of standards and guidance
Building (Scotland) Regulations 2004 set out the technical requirements and standards relevant to building work to protect the public interest. The Building Standards Technical Handbooks assist by defining the scope of action expected under each standard by providing one or more examples of how compliance with the standard can be achieved, noting that the standards can also be met through solutions not included in the published guidance. . There are two Technical Handbooks (THs) – a Non-Domestic Technical Handbook (NDTH) and a Domestic Technical Handbook (DTH). Section 2 of the THs relates to standards and guidance for fire safety.
This chapter considers respondents' views on what topics and guidance in the THs should be reviewed, improved or added. It also addresses whether the current mandatory standards and supporting guidance are considered by respondents to be robust, effective and clearly understood to deliver the intended safety outcomes.
Q1a. Are there existing fire safety topics and guidance in the technical handbooks that should be reviewed?
| Respondent type | Sample size (n=) | % Yes | % No | % Not sure | % No answer |
|---|---|---|---|---|---|
| All respondents | 57 | 91 | 0 | 2 | 7 |
| All answering | 53 | 98 | 0 | 2 | - |
| Individuals | 11 | 91 | 0 | 9 | - |
| Organisations: | 42 | 100 | 0 | 0 | - |
| - Trade Association | 8 | 100 | 0 | 0 | - |
| - Local Authority | 7 | 100 | 0 | 0 | - |
| - Professional Body | 4 | 100 | 0 | 0 | - |
| - Consultancy | 5 | 100 | 0 | 0 | - |
| - Construction Industry | 4 | 100 | 0 | 0 | - |
| - Manufacturer | 4 | 100 | 0 | 0 | - |
| - Housing Provider / RSL | 3 | 100 | 0 | 0 | - |
| - Other | 7 | 100 | 0 | 0 | - |
Almost all respondents who answered Q1a (98%) agreed that there are fire safety topics and guidance in technical handbooks that should be reviewed, while a small number were not sure (2%). In this, all organisations (100%) and nearly all individuals (91%) indicated there were topics or guidance that should be reviewed.
Nine out of ten respondents left an open comment at Q1a. A wide range of areas were raised, of which some were suggested as new areas in the technical handbooks, which are incorporated into Q1b. The most prevalent themes at Q1a were external fire spread, compliance or alignment issues, automatic fire suppression systems and cavities.
Spread to neighbouring buildings (Standard 2.6) and Spread on external walls (Standard 2.7)
Many respondents left comments about Standard 2.6 and Standard 2.7 – on fire spread to neighbouring buildings or on external walls.
One respondent suggested these sections could be updated in line with Local Authority Building Standards Scotland (LABSS) and Scottish Building Standards Hub (SBSH) materials produced to assist with interpretation. Another respondent suggested including a reference to the principles with Approved Document B related to the 50% consideration for external wall cladding systems as covered in LABSS Information Paper INFOP39 Version 2 – ‘Guidance clause 2.6.4 External wall cladding – amended with examples’.
Comments on cladding were most common, with suggestions including:
- Simplify standards on cladding to create a single, streamlined clause that sets out requirements, exceptions and definitions in one place.
- No guidance is currently available to clarify expectations on junctions with roofs (clause 2.6.1).
- Provide clearer definitions of cladding types and outline when test evidence is required to demonstrate compliance for specific systems. This should include explicit requirements for documentation, performance data, test standards and acceptable forms of verification.
- Add a distinction in relation to service penetrations that, although they are not part of the cladding system, their presence should be considered in relation to the potential for them to ignite the façade system or allow the passage of fire and smoke.
- To ban the use of combustible sheathing boards in any building with a storey 11m or more, to avoid a route for vertical fire spread on the outside of a building.
- Offer clearer guidance on cladding systems incorporating air gaps, including the role, placement and specification of cavity barriers and how these must be applied in different façade build-ups, for instance, to avoid anomalies with certain types of facades, e.g. ventilated facades.
- External wall cladding could restrict the use of Euroclass B materials, so they are not permitted for use in certain conditions for domestic buildings lower than 11m.
“The Building (Scotland) Amendment Regulations 2025 have updated the definition of traditionally constructed buildings and made amendments to Standard 2.15. The Clause 2 review should extend this work to address two residual gaps: first, whether the existing hotel exclusion from the cladding ban is consistent with the Phase 2 evidence and the Cameron House findings; and second, whether the current guidance sufficiently addresses the risk of fire entering a building through windows, balconies, or other vulnerable elements when an external wall system — even a compliant one — is burning in proximity. … Standard 2.7 guidance should address this re-entry risk explicitly.” – Organisation
Other views included:
- A few respondents raised issues with the enclosing rectangle method:
- Declining use of this method now that BR187 ‘External Fire Spread’ is available, and a review to ascertain relevance would be useful.
- There are still references to out-of-date standards, e.g. the tables have not been updated.
- No consideration is given for buildings that already fall in the Table B category and are provided with a suppression system. BR187 makes allowances for the reduction in separation distance or increase in unprotected area. As the tables are based on this guidance, the Standard should be updated in the THs.
- Guidance that addresses the retrofit external wall insulation (EWI) where an agreed approach is to include a band or A1/A2 materials in the EWI systems along lines of horizontal and vertical separation (a topic on which a LABSS information paper is currently being updated).
- To clarify external wall systems and the extent to which glazing systems should achieve class A1 or A2, e.g. toughened laminated glazing.
- Consider harmonising guidance between Scotland and the UK on the allowance for buildings with suppression systems for buildings more than 1m from the boundary (Table 2.6 NDTH). This allowance is currently in the Approved Document ‘B’ in England and Wales for domestic buildings, and the NDTH gives an allowance, but the DTH does not.
- Consider including a link to LABSS Information Paper INFOP43 on guidance on the verification of cladding remediation building warrant applications to increase visibility of this guidance during cladding remediation work.
- Table 2.9 (NDTH) could consider whether 500m2 and 200m2 are appropriate or whether this should be use-based and not area-based. An explanation of where this measurement comes from would be beneficial, along with clarification on ‘total storey area’.
- Simplify the principles on fire performance requirements for external walls, as they can be difficult to interpret and apply to modern façade types, and provide specific guidance and diagrams to aid understanding.
- Include more on external wall fire spread provisions, especially as facades and cladding systems become more complex.
Compliance or alignment issues
Several respondents at Q1a, and a few at Q1b incorporated here, felt that efforts to clarify compliance arrangements should be made in the THs. It was noted that the current approach tended towards a ‘tick box’ approach with compliance prioritised over fire safety, that it was overly complex, that it contributed to inconsistency across areas and had led to a greater reliance on certification and evidence due to a lack of supporting guidance.
A range of disparate recommendations were provided on this topic, such as:
- More clearly delineating between mandatory and optional guidance.
- More prominent reference and alignment with relevant industry standards.
- The need for stronger enforcement powers to drive higher standards.
- How to demonstrate compliance for existing buildings, what the benchmark performance should be in relation to existing and current regulations and setting out expectations for existing building retrofit works to aid designed and approving authorities to adopt a consistent framework.
- More guidance on fire resistance and surface spread of flame routes to compliance, such as Direct Field of Application, Extended Field of Application, Technical Assessments, etc. Industry guidance in ASFP Technical Guidance Document 34 could be referenced here.
- Prominently incorporate probabilistic Fire Risk Assessment (FRA), as outlined in BS 7974 Part 7, allowing for risk-informed design, particularly for complex buildings where prescriptive guidance may be overly conservative or insufficient.
- Noting alternative approaches may be appropriate routes to compliance where justified and setting out what such alternatives might be.
- Building Standards Division (BSD) should clarify whether Scotland should operate a Functional system with prescriptive alternatives, or a Prescriptive system with performance by exception, as the current mix creates confusion and inconsistency.
- More clearly articulating the interaction between building regulations compliance and ongoing building safety and management duties, including clearer signposting of the limits of regulations and the importance of maintaining design intent beyond completion, particularly where operational or management measures form part of the fire strategy.
- Harmonising guidance with other parts of the UK, such as in relation to suppression, compartmentation and means of escape. One queried whether the information published on the review of Approved Document B in England and Wales would be undertaken when updating the Handbooks.
“The current framework is becoming increasingly complex, with multiple thresholds and differing requirements depending on building height and tenure. This complexity makes it more difficult to apply the standards consistently and efficiently and know where responsibility lies.” - Homes for Scotland
“There is a need to review guidance where compliance is currently demonstrated by reference to interpretation rather than by clear, testable outcomes. Areas such as compartmentation, cavity barriers, external wall construction, service penetrations, and assumptions underpinning “stay put” strategies would benefit from clearer intent, stronger evidential requirements, and more conservative safety assumptions, especially in retrofit or conversion projects.” – Individual
“An over-reliance on prescriptive rules can lead to a focus on compliance rather than genuine safety outcomes, and fire safety assessments should therefore only be undertaken by those with appropriate competence, knowledge, and experience. Fire safety guidance, while intended to support compliance, can sometimes create a false sense of security. Prescriptive guidance may appear to guarantee safety, yet relying on it without careful consideration of the specific building context can inadvertently result in unsafe conditions.” – Individual
Automatic fire suppression systems (AFSS) (Standard 2.15)
A range of views was expressed by several respondents regarding guidance on AFSS. Mostly these related to specific building types, such as:
- The need to address sprinklers in enclosed car parks, as currently this is not covered in the guidance.
- The need to align guidance for AFSS in warehouses with other countries. An example was given that other major competitors require sprinklers to be fitted at an area threshold of 2,000-4,000 m2 in single-storey warehouses, whereas in Scotland it is 14,000m2.
- Noting that BSD has received applications to relax or dispense with the Standard 2.15 suppression requirement for low-rise and small-scale conversions and extensions.
- Extending the requirement for AFSS to existing multi-tenancy traditional buildings undergoing FRA review, not only conversion projects.
- A query over why AFSS for all social housing dwellings is required, when it is not for other tenures, which was considered disproportionate and discriminatory by members of a representative body in this sector.
- Seeking clarity on whether private schools are included in Standard 2.15.5.
- Seeking clarity on suppression requirements where individual flats are converted one at a time but ultimately from multiple flats, ensuring consistent application for phased or staged conversions.
- Noting that in some circumstances, a shared multi-occupancy residential building could present as less onerous than shared residential accommodation. Further clarity on the definition of shared multi-occupancy residential building if is considered more of a risk than shared residential accommodation in relation to the application of TS 2.15.6.
- Updating guidance requiring fire sprinkler systems to be designed and installed in a flat or maisonette to reflect the latest standard.
Other points on AFSS included challenges meeting nozzle testing to BS 8663-1, given that no nozzle manufacturer has successfully passed the test; therefore, additional guidance was sought to support verifiers and better inform designers until testing is successful. Similarly, a backlog in testing led to a call to review the suitability of Water Mist Systems in Time Equivalence calculations for reduction in Structural Fire Resistance.
Two respondents highlighted references to the Loss Prevention Council (LPC) rules for AFSS in the Technical Handbooks. One noted that these rules were understood to be an insurance standard, required by insurance companies to enhance provisions beyond BS EN 12845 recommendations. This respondent called for more clarity on life safety systems and the appropriateness of British Standards to be applied, and why other life safety components are acceptable to British Standards but not sprinklers, and on the type of sprinkler standard that should be adopted for a given application. The other felt the rules were onerous and should not be considered necessary, as the additional requirements for LPC rules are for property protection rather than life safety.
One respondent noted that a review was required of AFSS guidance, given the withdrawal of BS 8458:2015 and the introduction of the BS EN 14972 suite of standards.
“Clarity should be added to the Technical Handbooks to explain the referencing to LPC rules, i.e., to be noted where required to achieve specific conditions of the Technical Handbook (e.g., increasing compartmentation), or to meet insurance requirements. There does not appear to be an instance when a BS EN 12835 alone compliant approach (excluding the need to meet the conditions of LPC Rules) would be an appropriate baseline for specific applications – this should be clarified.” – Arup
Cavities (Standard 2.4)
The need to revise guidance relating to cavities was mentioned by several respondents. Views varied, though most commonly, Open State Cavity Barriers were mentioned by some of these respondents.
Views on cavities in general, including on the common theme of Open State Cavity Barriers (OSCB) included:
- Disparity between 2.1.15 and 2.4.1 where OSCBs can be used.
- Recent revisions to Clause 2.4.2 are without an adequate evidence base, with references to smoke spread considered overly simplistic.
- The need to clarify the suitability of OSCBs when proposed as fire barriers, not just cavity barriers.
- The need to clarify OSCBs may not be appropriate in some circumstances e.g. facades containing combustible materials or higher risk buildings.
- Concern expressed around the use of OSCBs in buildings where there is a sleeping risk.
- Review risks associated with open voids, such as in roof spaces, given that 10m/20m requirements may be overly onerous.
- Clarify that where a wall subdividing rooms is carried into a roof space to form a cavity barrier, then the wall must provide the fire performance expected of a cavity barrier.
- Reference the need for additional cavity barriers to align with compartment elements in the building and the need for discontinuities in the building profile (e.g. corners) and with penetrations (e.g. ducts) and windows and doors.
- Two called for the LABSS Consortium Technical Working Group (CTWG) Codes of Practice to be included.
- Additional guidance to clarify cavity barrier performance at party wall junctions and how cavity barrier provisions interact with ventilated/open screen facades and with Standard 2.7.
- Consider making residential (other) buildings with a simultaneous evacuation policy requiring solid construction (i.e. to reduce smoke spread) rather than a fire-resisting barrier.
- Review the testing of cavity barriers for the external wall, where there is a controversy over the use of furnace testing, for Closed State Cavity Barriers as well as OSCBs.
- Consider challenges of real-life testing with Scottish components and pre-1919s when interpreting cavity barrier design.
- Include reference to how to ensure the integrity of fire-stopping in ‘Volumetric Modular’ construction, where fire spread often occurs in the concealed junctions between prefabricated pods.
- Review Clause 2.4 to require void network assessment and cavity health classification as a mandatory FRA requirement for traditional buildings.
“Open state cavity barriers take time to close in fire as they rely on intumescent material activating at a specific temperature to seal the opening. Application of these products therefore allow for the passage of fire and smoke in early stages, as well as raise concerns with flaming droplets bypassing compartmentation. In addition, these systems rely upon the cavity being ventilated to atmosphere which requires additional design considerations to ensure this ventilation route is sufficient for the dispersal of smoke and toxic gases. Intumescent cavity barriers are not tested in a way that is anywhere near reflective of their application - this should be explained and referencing provided which supports the Building Standards Division decision for OSCB application, making clear what limitations of application apply. Arup recommends a statement to be added on the use of OSCB as follows: ‘Where the application of OSCBs are not supported by appropriate testing and certification for a given application then they should only be used when supported and found to have no life safety risk by means of a Fire Risk Assessment.’ – Arup
“DTH Guidance clause 2.4.4 – guidance on ‘external wall’ and ‘external wall cavity’ would be beneficial, as outlined in 11/23/CTWG/TECH BSD clarification on the intent of guidance clause D2.4.4 and ND 2.4.6 update to CTWG.” - Local Authority Building Standards Scotland (LABBS)
Compartmentation (Standard 2.1 NDTH)
Detailed views on compartmentation in non-domestic buildings were provided by several respondents. This is a practice of dividing a building into separate fire-resistant areas (compartments) so that fire and smoke are contained in the area where the fire starts for a specified period.
General singular points included that Standards 2.1 and 2.2 (Separation) overlapped and could be combined, that there was inconsistency in areas relating to compartmentation upgrades in conversion projects, that there were variations between Table 2.1 and 2.2 (see quote below) and calls for greater clarity around provision for compartment walls being reduced to medium in Table 2.2 footnote 3.
“There is less flexibility in the single storey table 2.1 than that of multi storey building 2.2. For example; a Storage building Class 1, needs to be long fire resistance for a Storage class 1 building, but in a multi storage building, if the area of the largest compartment is less than 200m2 can be medium. It would be of benefit to extend this flexibility to multi-storage buildings (and similar for other building uses).” - BB7 Consulting LTD
Points raised at different clauses of this standard are grouped together below.
Maximum compartment sizes (clause 2.1.1):
- To recognise evidence that suggests the fire resistance of open-sided carparks should be 60 minutes rather than 30 minutes, and to update the guidance accordingly.
Smoke and heat exhaust ventilation system (SHEV) (clause 2.1.3):
- Seems limited compared to guidance on heat and smoke control in the DTH.
- Address inconsistency in the guidance regarding the floor area of shops and reservoir sizes. For instance, the guidance states shops with a floor area of greater than 1,300 m² require SHEVs, but in BR 186, where natural ventilation is used, this threshold is stated as 1,000 m². The guidance requires a reservoir area of 2,000 m², which corresponds to a naturally ventilated system. If mechanical ventilation is used, the reservoir area should instead be 2,600 m², which was felt not to clearly align with the shop area thresholds.
Places of special fire risk (clause 2.1.8):
- Two respondents suggested reviewing guidance for paint spray booths, for instance, as PM25 may no longer be relevant to prefabricated paint spray booths.
Openings and service penetrations (clause 2.1.14):
- Clause 2.1.14 should be received with permissible penetrations of up to 40mm removed to ensure contractors address defects, such as small holes requiring fire-stopping.
- Adding or clarifying requirements for metal pipe penetrations in fire-resisting walls/floors to achieve an insulation performance criterion.
- Where ventilation systems are referred to, to include provision of automatic fire and smoke dampers, to prevent fire and smoke spread to protected routes.
- Update the fire-stopping clause and reference the Association for Specialist Fire Protection’s Red Book: Fire-Stopping.
- Update the section on fire-stopping to recognise all penetrations move and flex, and the potential risks of using generic mortars, plaster and cements, including wide variability in quality of generic mortars.
- Reflecting modern building services layouts when considering service penetrations (Mechanical Ventilation with Heat Recovery (MVHR), Air Source Heat Pump (ASHP) pipework, PV cables, EV charging infrastructure).
Junctions (clause 2.1.15):
- Two respondents noted information from LABSS Information Papers (e.g., no. 36) on this topic could usefully be incorporated into the guidance.
- More robust justification and guidance, particularly regarding junctions with roofs and fire-resistant ceilings, as there is a lack of clarity over what is considered a roof substrate in relation to an insulated roof panel (with combustible core) where it extends over a compartment or separating wall. More clarity was also sought over fire-rated ceilings or fire-stopping in flat enclosures to the underside of the roof.
- Clarify what the junction should align with if the wall / separating floor has different fire resistance types or durations.
- Clarify wording in bullet point 2 in the clause on Junction with Roofs. Current wording potentially leaves the option for timbers, OSB or combustible insulation to pass above the fire stopping but below the low vulnerability roof covering.
Escape (Standard 2.9)
The need for guidance on escape to be revised was highlighted by several respondents. Detailed comments on this Standard were provided, such as from the City of Edinburgh Council and Arup, and readers are advised to review such responses directly.
Most comments related to escape route and escape route widths (e.g. clause 2.9.8):
- Guidance on ‘Escape stair width’ (clause 2.9.31) appears to allow a reduction in width in relation to occupant numbers, whereas ‘Escape route widths’ (clause 2.9.8) appears to only allow for a reduction ‘where stepped access’ is in place. However, they are both reduced by the same amount and dependent on the same occupancy.
- Clause 2.9.8 could be improved to confirm that any reduction in width for gangways does not extend to escape routes which are not between fixed racking or shelving and high bay storage.
- Consider adding a caveat to Figure 2.5 in 2.9.10 to indicate that it should only be considered for the purpose of providing guidance on the measurement of travel distance and should not be regarded as detailing all of the relevant requirements contained in other sections of the guidance clauses in relation to a layout that has two escape routes, such as smoke ventilation requirements.
- Require escape routes to be constructed of non-combustible materials, achieving a reaction to fire classification of 2-S1, D0 or better.
- Ventilation of escape routes (2.14 DTH) – could be clearer on the measurement of Automatic Opening Vent Aerodynamic Areas, as covered in the LABSS Information Paper INVO41.
- Escape routes – options (2.9.10 DTH) – the fourth paragraph directs to table 2.4; however, it should be 2.6.
- Improved linkages between sections 2 and 4 (at 2.9.4) regarding the provision of escape windows and the standards for cleaning of glazing and the provision of protective barriers (refer to the draft information paper 45/21/CTWG/DRC/THC 2.9.4).
- Escape routes – protected zones (2.9.12 DTH) – guidance does not state that once you enter an escape stair, it should terminate directly to a place of safety.
- Escape routes – smoke ventilation (2.9.14 DTH) – to provide clarity on when protected corridors require ventilation and correct direction to a table which does not reference protected corridors.
- Escape routes – mixed-use buildings (2.9.17 DTH) – to replicate the messages from the DTH across to the NDTH (2.0.3) to enhance consistency and clarity.
Protected lobbies (NDTH 2.9.23 / DTH 2.9.17):
- Clearer wording is needed regarding when protected lobbies are required, as currently it could imply that buildings with more than one escape route do not require protected lobbies (2.9.23).
- Clarify requirements for ventilation in low-rise domestic buildings that have a non-domestic use connecting to the escape stair (2.9.17).
- Clarify that the fire resistance period required is relevant to all escape stair and protected lobbies, regardless of height (2.9.23).
Openings in Floors (clause 2.9.14 NDTH):
- Provide guidance for those openings in floors that are compartment floors and highlight BS 9999 guidance.
- Emphasise that the risk is radiation from the fire and smoke plume and not the smoke layer.
- Clarify that fire stopping or fire enclosure of shafts penetrating non-fire resisting floors is not required, as some verifiers consider enclosed service risers and lift shafts through non-fire resisting floors as openings.
Locks and locking devices (2.9.18 – 2.9.21 NDTH):
- Two respondents called for more comprehensive guidance due to issues such as unsuitable domestic locks used in non-domestic settings.
- 2.9.21 could be updated to consider the use of electromagnetic locks on all escape routes and in single escape route buildings.
- Query whether a requirement of at least one mechanical escape route on body pressure alone is still appropriate.
Other points raised on the escape standard included:
- Restructuring the section to improve the sequencing and internal coherence, involving setting out strategic concepts before detailed construction requirements.
- Explaining the numbers provided and reviewing the wording relating to fire engineers and verifiers.
- Escape in dwellings – open plan option with suppression and enhanced early warning (2.9.7 DTH) – two sought clarity on the distance that could be considered ‘remote’ when calling for kitchens to be remote from exit doors in open plan dwellings. Information from this clause should be replicated in the NDTH on residential accommodation.
- Improve the clause on ducted heating and ventilation systems (2.9.8) by providing additional information around the risks outlined and addressed in the LABSS Information Paper INFOP24 2019 DMEV/MEV Installation in a flat with a protected enclosure – principles also referenced in 3.14.2.
- Protected enclosure (2.9.5) – clarify options for the location of any protected walls/doors and provide simple diagrams to aid clarification of intent.
- Direction of escape – (2.9.9 DTH) – achieving the required distance to prevent two room exits from being impassable is challenging in smaller premises, and it would help if the guidance could set out alternatives to the criteria.
- There are ten references to a protected corridor in the DTH, but little detail is provided to explain where they are required and where they need to have smoke ventilation.
Comments on building types and uses
A broader approach to reviewing the guidance was taken by several respondents at Q1a and several at Q1b incorporated here, who commented on the guidance in relation to certain building types or uses. Settings for which further guidance would be welcomed included maturation warehouses, storage buildings, short-term lets, student accommodation, stadiums, airports (hangars), places of lawful detention, non-domestic buildings with sleeping accommodation, e.g. sleeping pods, apart-hotels, hotels, agricultural buildings and traditional and historic buildings.
“Consideration should be given to reviewing building definitions and categories, particularly in light of the increasing number of multi-use, mixed-purpose and mixed tenure buildings. There may be merit in reducing the number of categories and instead placing greater emphasis on the groups, activities and actual use of buildings.” - Aberdeenshire Council – Building Standards
Suggested further work on HRBs was highlighted in this theme. Recommendations included:
- Giving further consideration to the definition and treatment of HRB to avoid the unnecessary inclusion of buildings in the category, such as including shopping centres and places of entertainment on a case-by-case basis given the layout, storey number, height and materials will different considerably in each.
- Broadening the scope of buildings where combustible materials in external walls are prohibited to include HRBs, which should include places where vulnerable occupants may be at increased risk.
Comments on traditional or historic buildings were made by a few, including:
- Section 2 should incorporate the supplementary guide on traditional and historic buildings to avoid uncertainty as to how the THs apply.
- Large panel system buildings, including those over 18m in height, notably require specific guidance on structural fire resistance, stability and compartmentation for large panel system construction type buildings.
- The distinct risk profile associated with large multi-occupancy buildings, e.g. railway stations, museums, theatres, including addressing complex and concealed construction, uncertain compartmentation due to alterations over time, large open volumes delaying detection, high and variable occupancy and difficult fire service access.
Other suggestions included:
- Expanded detailed guidance on mixed-use buildings and complex mixed-use occupancies and dwellings over 200m2.
- In high-rise buildings, given the aim is to prevent fire spreading between any floor, then every floor should be constructed as a compartment floor, not just those above 18m.
- Fire alarm types can be complex and contradictory for hybrid or small buildings, so further options would be welcome.
Separation (Standard 2.2)
Several respondents left comments on the Separation Standard. General changes sought included:
- A few who called for greater clarity on acceptable construction details where insulation passes over a separating / compartment wall. Current guidance identifies the substrate as requiring to be A1/2; however, this doesn’t mean all components of a built-up roof are to be considered as the substrate. This could lead to: ‘an A1 base layer but combustible insulation creating a flanking path for fire to breach the separating / compartment wall’.
- Clarification of the required level of fire protection for separation using plasterboard.
- Clarification under Domestic garages (2.2.4 DTH) whether pipes, wires and other services are permitted in the integral garage separating wall as noted in 2.2.6. Also, to clarify if such services are permitted in a separating floor and whether it applies to wet heating system pipes.
- Requiring explicit compartmentation verification as part of the FRA for existing buildings where Stay Put is adopted and specifying what verification must cover.
- Clearer and updated guidance on design parameters on deflection heads at separating walls, particularly in the behaviour of the structure in a fire condition.
- Providing guidance on where the location of any fire barriers would negate the requirement for insulation performance, such as at a boxed eave junction, but also in more critical areas, i.e. separating wall / floors and external wall junctions.
- That the THs should require fire-stopping for services passing through a separating wall or floor, contrary to the current guidance, where it does not, under Openings and service penetrations (2.2.9). This respondent went on to note:
“As with all fire‑resisting construction, fire‑stopping around pipes should be verified through appropriate testing; we consider that reliance on unproven or arbitrary fire‑stopping materials in these situations is not an acceptable approach to fire safety.” - ROCKWOOL Ltd
Junctions (2.2.10 DTH/ 2.2.7 NDTH):
- Giving further guidance on suitable junction detailing would be useful, including advice on what constitutes the roof substrate and how to consider risks of an insulated roof panel core continuing above the wall head.
- Improve guidance on the specific roles, differences and performance requirements of cavity barriers and fire barriers would be useful, explicitly addressing the soffit / eaves void area at the line of separation, cf. LABSS Information Paper INFOP32 – Version 2 and INFOP37 Version 1 – Junctions.
Comments on Fire and Rescue Services
Views were expressed across the three Standards relating to the Scottish Fire and Rescue Service (SFRS). The themes in this section are written in prevalence order.
Fire and Rescue Service Facilities (Standard 2.14):
Some respondents highlighted vague or confusing aspects of this standard. Recommended improvements included:
- Giving details on how to design smoke ventilation systems, the limits of their use or which should be used to satisfy Standard 2.9. For instance, the guidance could recognise that a natural shaft or mechanical smoke ventilation using pressure differentials may be used to inhibit smoke spread into the fire-fighting stair. Alignment with the approach in England and Wales Approved Document (Section 16.3 of Approved Document B Volume 1 and Section 8.3 of Approved Document B Volume 2) was recommended, which requires two conditions to be met to not require smoke outlets, rather than one as set out in the THs. It could also be highlighted that further information is provided in clause 27.1 of BS 9999:2017.
- Revising clauses 2.9.24, 2.14.2 and 2.14.3 in terms of possible omission in 2.14.3 to recognise the short duration reference in 2.9.24.
- Reviewing the standard to ensure it still reflects modern fire practices and equipment. If designers follow the guidance, it could incur unnecessary costs to a building as the facilities would not be utilised in the event of a fire, e.g. the height at which a dry riser is installed and the provision of a protected lobby on the top storey.
- Reviewing the reference to being unlikely to need to evacuate an entire building, considering this may be required in fires involving combustible materials or where the structure has become compromised.
Fire and Rescue Service Access (Standard 2.12):
Some respondents felt this standard should be updated or given further details. The need to reflect current vehicles used by Fire and Rescue Services was the most prevalent view. One felt the guidance on turning circles / hammerheads did not reflect the different vehicles used and was inconsistent with planning guidance for roads. Another requested a review to identify whether it is still the case that vehicles were being designed to accommodate a high reach regardless of building height to maximise the number of vehicles that could attend.
One felt additional guidance would be beneficial on space requirements in front of dry riser inlets and outlets to support hose connection and deployment.
Fire and Rescue Water Supply (Standard 2.13):
Reflecting the Paul Grimwood research incorporated into BS 7974 was recommended by one of the few respondents who commented on this standard, while another called for clarity on the flow rate capability required in relation to the public water supply (2.13.2) and how it can be calculated.
Communication (Standard 2.11)
Some respondents left disparate comments on Standard 2.11 on communication. LABSS made various suggestions, for instance, they and another respondent called for more guidance on investigation periods in certain buildings, such as hotels. Readers are advised to view the LABSS submission directly for more details. Other views included the need for:
- Further guidance on the appropriate implementation of investigation periods in certain buildings.
- Clarification on alternative means of escape from an inner room where no escape window is present, e.g. 2.11.1 seems to suggest having a smoke alarm in the access room is sufficient, but 2.9.4 states an escape window is required.
- Guidance relating to Fire and Rescue Service provisions appears to be based on outdated practices and equipment (as was Standard 2.14), though no further detail was provided.
- Improved guidance on smoke detection, e.g. in domestic roof spaces (see 20/21/CTWG/PROC/LABSS), Stay Put strategies.
“Current guidance for standard 2.11 appropriately discourages communal fire warning systems in buildings with a Stay Put arrangement. As discussed in response to Question 4 on evacuation on alert, this creates a gap when the strategy must transition during an active fire. The guidance should be reviewed to address the detection and communication requirements for the strategy transition scenario — not just the steady-state Stay Put or simultaneous evacuation positions. The new Guide to Conversion of Traditional Buildings (published for use from 6 April 2026) recommends enhanced automatic fire detection and alarm systems where other fire precautions depart from Technical Handbook guidance. This principle should be extended to apply to existing multi-tenancy traditional buildings undergoing FRA review, not only conversion projects.” – Organisation
Structural protection (Standard 2.3)
Some respondents offered suggested revisions on Standard 2.3 Structural protection, such as:
- Emphasising the importance and purpose of structural fire resistance by including it in the introductory section to the THs.
- Providing additional guidance on how to demonstrate the fire performance of concrete lintels.
- Formally recognising Building Standard Division (BSD) advice on the approach of not sheeting internal gable wall timber frame panels above the ceiling lining (roof space area), where more than 1m from the boundary.
Annexes
Comments on the Annexes of Section 2 were left by some respondents.
Annex 2A Additional guidance for residential care buildings:
Views included that the Annex was a duplication of the SHTM 80 (Scottish Health Technical Handbook) and should be removed, and that the interpretation of the Annex varied. One respondent noted the number of hazard rooms in care homes could present design and construction challenges should the requirement continue for sub-compartmentation and enclosure of fire hazards. They called for clarification of whether 2.1.15 is equally relevant to junctions of sub-compartment elements and fire hazard rooms.
Annex 2B Additional guidance for hospitals:
Two left comments, both indicating existing guidance for healthcare buildings, such as Annex B, did not reflect modern design approaches. The trend toward single-patient accommodation and associated evacuation strategies was felt to impact long-established horizontal evacuation principles in hospitals and the hazard room definition.
“New clinical guidance for privacy and infection control creates problems with hospital design as all wards’ corridors serving bedrooms are being treated by NHSSA [NHSScotland Assure] as protected corridors, which makes it near impossible for the ward to function as it would preclude vital healthcare facilities and nurse bases in the corridor. Arguments on this item not only cost design teams thousands, but by extension the taxpayer” - Individual
Annex 2D Resistance to fire:
Comments or suggestions by a few respondents included:
- The Annex is difficult to follow, not well structured and has poor readability.
- Remove BS 476 fire resistance classifications from the THs and replace with EN classifications. EN classifications were generally considered more rigorous and better aligned with real-world fire hazards than the equivalent BS standards.
- Clarify the requirement for fire protection to be provided to roof members in a multi-storey portal-framed building.
- Add the following fire standards: EN 1366-3, EN 1366-4, EN 1264-6. Could also refer to ASFP Technical Guidance Document 34.
- To what specific wall types / partitions does additional Information Note 3 apply, i.e. this is often applied to external walls, but it is not clear whether this is the intention of this note.
Technical Handbook: Fire Introduction
Suggested revisions to the Fire introduction section of the THs were made by some respondents. Views included:
Scope (2.0.3):
- Some elements are limited, e.g. buildings with a height of more than 60.
- No mention is made of the combustibility of the structure, so it is possible to bypass 2.0.7 without realising the significance. The need for direction to 2.0.7 when a combustible structure is used should be stated in 2.0.3.
- Aspects considered out of scope: modern methods of construction require special considerations, such as the way services are fire-stopped.
Rules of measurement (2.0.4):
- Reference to the ‘height of a) a building shall…and b) a storey above…’ could be simplified and a diagram included.
- Additional guidance to outline that reference to plant storeys in this clause only relates to the storey height consideration and doesn’t intend to ignore such storeys and the necessary provision of firefighting facilities at the levels where required under standard 2.14.
Explanation of terms (2.0.6):
- These terms could be better signposted, such as in the main defined terms section. Currently, these terms could be missed, in particular the 8m2 balcony and its effect on travel distances and escape sequence.
Alternative approaches (2.0.7):
- This section suggests early engagement with the building standards verifier; however, this is not always possible, and the nature of engagement can vary.
- Could reference BS 9999 as this can be a useful reference point and aid to Building Standards Officers during their vetting applications. This is not currently mentioned in the THs. If this document is not to be used as guidance, this should be specified. Could also reference BS 9991.
- Could highlight the implications on spread of fire to neighbouring buildings.
- Should include more guidance on the competence of those submitting alternative approaches.
- Independent third-party certification and accreditation (2.0.10).
- There should be an explicit direct link from this clause to the Compliance Plan Manager/Approach, including direction on who, how and when evidence must be delivered.
General points included:
- A need to include standard measurements and example figures, e.g. height as it relates to the structure, external fire spread and on sloping sites, etc., to avoid discrepancies between design teams and verifiers. Defining ‘ground’ would be beneficial.
- The notes on the Construction Design and Management Regulations 2015 (page 105) are too brief and do not include the importance of Design Risk Management, the role of the Principal Designer and Principal Contractor regarding design risk, the role of the Fire Engineer as a designer and the function of the Health and Safety file.
- There is no reference to BS EN 15725 in relation to varying from test evidence; this should be rectified with clear direction on when to adopt and how to implement.
Other views
A few respondents raised Internal Linings (Standard 2.5). Points included the need to reference the core of the sandwich panels, which influences overall performance in fire, clarifying the meaning of ‘wall and ceiling surface’, and addressing internal lining requirements in service voids, felt to be inconsistently interpreted by verifiers. One respondent felt discussion around secondary power and life safety services should be expanded, and one felt the THs should also review the effect of overheating and/or air circulation in flats/housing.
Q1b. What new fire safety topics should be included in the technical handbooks?
Over four fifths of respondents left an open comment at Q1b. The most prevalent themes were battery energy storage systems (BESS), Photovoltaic (PV) systems and electric vehicles and car parks. To structure this section, themes were grouped together, so the prevalence order is provided in the grouped theme.
Modern technologies
Fire safety implications of modern technologies were the main topic respondents felt the THs should reflect better. These technologies included BESS and lithium-ion batteries, PV systems, electric vehicles and ASHPs.
The most prevalent theme was that BESS systems and risks caused by the storage of lithium batteries should be considered in the THs. This was raised by many respondents at Q1b and some at Q1a, incorporated here.
Specific suggestions for updating the THs in relation to BESS and lithium batteries included:
- A new clause on this should be created covering:
- Threshold quantified above which a formal consequent pathway assessment is required.
- The fire risk and consequent pathway from lithium-ion batteries.
- When a building warrant is needed.
- Notification requirements to the landlord, managing agent and SFRS where threshold storage is proposed in a shared building.
- Specific Fire Safety Record entries for buildings with known lithium-ion storage above threshold.
- Whether limitations on locations of battery storage are required, for instance, external to buildings or compartment areas in shops below mixed-use buildings.
- Guidance on compatible suppression and detection systems, noting that standard smoke detection may not provide adequate early warning for lithium-ion thermal runaway and that water-based suppression interacts differently with lithium-ion fires than with conventional fuel fires.
- Direction on fire separation, detection, ‘thermal runway’ management, fire safety considerations, cooling and possibly suppression.
- That no specific UK standard covers commercial BESS, while PAS 63100 covers domestic BESS. The CROSS paper: Fire Safety Concerns with Lithium-ion Batteries could be referenced.
Risks and issues associated with PV panels and inverters, especially on rooftops, were highlighted by many respondents at Q1b, and several at Q1a incorporated here. For instance, the potential of PV panels to cause fire, which can lead to trapped heat under the panels, increasing the temperature and intensity of the fire.
Comments on guidance in relation to PVs included:
- That EN 13501-5 and Broof(t4) referred to in the handbook do not address the specific, intensified characteristics of roof fires involving PV panels.
- Guidance of best practice industry documents, such as RISC Authority guidance RC 62, should be referenced.
- No indication is provided of how a roof performs when exposed to fire from inside a building, as BS EN 13501-5 only assesses how a flat roof may behave when exposed to an external fire source.
- The trend to off-the-shelf plug-in with 13 A plug PV panels falls into the area of external cladding, e.g. if the product is hung from a balcony.
- It is difficult for engineers in the UK to apply Approved Document Part B as there is no information on retrofitting PV technologies.
- Consideration of access for firefighters and to clarify the need to avoid access through openings where PV panels exist and the requirement for DC isolation switches to assist SFRS.
- Guidance to include minimum performance classifications for underlying materials and recognition of the intensified heat environment created. There is evidence that Loss Prevention Certification Board-approved steel-faced polyisocyanurate systems can be safe.
- Updated guidance should be grounded in holistic and performance-based solutions that are assessed at a system level, not solely based on the combustibility classification of some envelope components.
- The Building Safety Regulator in England is currently researching PV over and integral to roofs, which should be replicated in Scotland.
“Given current backlogs in fire testing and product classification, verification of over roof photovoltaic panels has been challenging for verifiers where no such testing or EN 13501 classification exists, particularly for retrofit applications proposed through climate change and energy efficiency initiatives. Additional guidance for these retrofit situations would be welcomed, especially on what constitutes suitable and sufficient fire performance evidence where classification is not yet available.” - LABSS
EV infrastructure and electric vehicle batteries were also considered an area where guidance could be developed by several respondents at Q1b, and a few at Q1a incorporated here, for similar reasons to those given for BESS. Relevant vehicles that could be affected included cars, mobility and other scooters and electric bikes. One respondent felt conflicting advice was being given regarding the positioning of electric vehicle charging points next to domestic properties.
Recommendations for how to improve guidance on this topic were given, including to:
- Consider life safety risks, ways car parks can be designed, including ventilation, fire suppression and other mitigation measures, and the storage of EV batteries in domestic buildings.
- Consider the fire risks associated with cable runs, trunking and external charging points in relation to EV charging infrastructure.
- Provide new guidance on EV charging zones, specifically covering enhanced sprinkler density and specialised smoke ventilation to handle the unique heat release rates of battery fires.
- Note that standard mechanical ventilation in underground garages may be insufficient to handle the rapid ‘off-gassing’ and explosive potential of a lithium-ion battery in thermal runaway.
- Adopt a CPA to ensure life safety systems are verified and operational.
- Undertake further research and review to address the changing dynamics of fires involving cars and the threat this poses to car parks and attached buildings.
More general suggestions across these technologies included:
- Including guidance on storage, charging, fire risk and fire protection measures related to electric vehicles and batteries.
- Consulting with the SFRS regarding expectations for firefighting in relation to emerging technologies, e.g. deployment of higher reach appliances, water supplies.
- Including guidance on facilities for the fire service in these situations.
- Undertaking research to understand the fire risks associated with new technologies.
Some respondents left brief comments on ASHPs, with two commenting that their location should be addressed in guidance, while another felt performance impact and safe enclosure design should be included.
“Changing use of space should require appropriate measures for fire resistance requirements. Recent events involving a vape shop highlighted that fire profile was more volatile and resulting fire development and spread was unexpected and the result was catastrophic. Therefore, classification of use of built environment should attract different measures. As well as the basics for establishing compartmentation, the required performance evidence needs to be checked against expected fire profiles for certain industries/uses.” - Individual
Building materials or features
A cluster of themes centred around the need for guidance on specific building materials or building features, such as timber construction, modern methods of construction or ventilation. These are presented below in prevalence order.
The need for more guidance on timber construction, notably mass timber construction and the use of engineered timber, was highlighted by several respondents. It was noted that mass timber construction is a growing industry, but could increase fire risks, which ought to be assessed by competent fire engineers. One respondent stated industry guidance had been developed on mass timber construction and should be incorporated but did not specify further details. The need for guidance to address emerging timber types, such as engineered timber, e.g. Glulam and cross-laminated timber (CLT), was mentioned. 03/22/CTWG/TECH/DUN Fire resistance of unprotected Glulam and CLT was noted as containing relevant information on this topic.
“Engineered timber is a new area of development. There seems to be reluctance in areas of Scotland to adopt this new method of construction, based on smouldering fires burning for longer and subsequently leading to collapse. However, if all occupants have been evacuated and fire containment measures initiated, is this really premature collapse if the building falls down 6hrs 24hrs, 28hrs later? The technical handbooks should be clearer on the requirements.” - Individual
Strengthening guidance on modern methods of construction (MMC) was raised by some respondents. One also felt that off-site manufactured systems required the same attention. It was felt that these methods could increase complexity, uncertainty and potential fire severity. To illustrate, one respondent felt the guidance does not sufficiently account for how MMC systems behave under fire conditions, including the presence of concealed voids, the complexity of interfaces between factory-produced modules, and the potential for rapid internal and external fire spread. They went on to state:
“As a result, the guidance does not provide the level of clarity or rigour needed to ensure that fire‑safety performance is reliably achieved in practice. The guidance also lacks clear requirements for the testing, detailing, and installation of MMC systems to ensure that as‑designed fire performance is reliably achieved in practice. Consequently, there is an increased risk of inconsistent interpretation, variable safety outcomes, and an over‑reliance on voluntary good practice rather than clear, prescriptive standards that reflect the specific fire‑safety implications of MMC and off‑site construction.” - ROCKWOOL Ltd
Suggestions for improvement included:
- Acknowledging the risks associated with MMC and advising that alternative fire engineering approaches may be required to demonstrate their safe use.
- Issuing new MMC-specific guidance covering design, testing, installation and long-term performance.
- Holding discussions with Passivhaus Trust to discuss how its certification processes could align with new fire safety requirements.
- Referencing the potential for fire spread in 3D modular construction from the cavities created by the stacking of the modules.
A few respondents felt the guidance should address ‘green walls’ or natural and bio-based products and materials. Recommendations included using materials aligned to the Scottish and UK-wide circular economy, requirements for ongoing maintenance and how such features can be incorporated into the design of buildings.
Modern ventilation systems and associated penetrations were also mentioned by a few respondents. Including relevance and availability of cause-and-effect documents for smoke ventilation, expectations for cavity barriers, fire detection, etc., and updating MVHR guidance on fire separation were recommended.
Other specific building materials or features mentioned included:
- Two respondents felt atria design should be included or referenced in the Annexes of BS 9999.
- Acoustic enclosures (performance impact and safe enclosure design).
- Tek screws: It was recommended that a definitive solution for dampers identified as having Tek screws should be presented. Guidance should require a suitable risk assessment of ducting using Tek screws at the breakaway joint.
- Fire curtains and what fire performance criteria these should achieve.
- Polymeric foamed insulation products were noted as commonly not carrying fire test certificates to be used between stud and plasterboard.
Firefighting and evacuation
Themes relating to firefighting, fire engineering and evacuation were raised by a few or some respondents.
Comments raised by some respondents regarding evacuation included calls for more guidance on the design and use of evacuation lifts, like section 7.3 of BS 9991:2024, to review when stay-put evacuation strategies are not appropriate, e.g. in timber buildings, and the evacuation of disabled occupants.
“Triggers should be established for when stay-put strategies become inappropriate and alternative evacuation measures are required, supported by practical sequencing guidance for fire-critical works with mandatory design change documentation.” - Scottish Property Federation (SPF)
Comments relating to firefighting were left by some respondents. Three respondents mentioned firefighting in rural areas, and it was felt this should be addressed, such as external fire spread in relation to wildfires and the risks and approach for remote dwellings, as outlined in 04/23/CTWG/PROC/SFRS. The need to consult with the fire authority where a specialist firefighting approach is required was recommended by one respondent.
Compliance checks / verifiers
Several respondents suggested that additional verification checks, requirements to be met or certification would be useful. Requiring checks, certification or inspections was suggested in the following areas:
- Utility supplies to traditional buildings should be inspected on a ten-yearly basis and recorded as in the case of the ongoing ‘Annual Landlords’ gas safety certificate.
- Competency checks for installers of cladding, fire stopping, and competency criteria for fire strategy authors and reviewers to reduce verifier disagreement.
- UKAS-accredited fire test laboratories or bodies operating to an equivalent standard should carry out any extended application of test evidence in accordance with BS EN 15725.
- ‘Deemed to satisfy’ requirements for typical fire junctions and element make-ups.
- A new approved certifier for construction for fire doors and other forms of passive fire protection.
- Determining what constitutes a competent fire-engineered submission and considering the involvement of peer review experience from the SBSH.
- Fire safety standards and regulations for the re-certification and re-use of materials (particularly where these were previously certified to older standards).
- Setting life safety ‘tenability’ criteria to allow designers and verifiers to ascertain when a fire engineered solution has satisfied the building standards, with explicit quantitative benchmarks.
“The Technical Handbooks should provide explicit quantitative benchmarks, enabling designers and verifiers to demonstrate that compliance achieves a defined level of life safety. Clear criteria, verification methods, and practical examples would support risk-informed, proportionate fire safety measures while aligning Scotland with the best international practice in evidence-based fire engineering.” – Individual
“Where fire stopping or fire protection systems are used outside the scope of a tested detail, or beyond the limits of application set out in a relevant classification report, it should not be assumed that a fire engineer alone can make a competent judgement on suitability. Most fire engineers do not have direct experience of the large number of full scale and small-scale fire tests required to understand material behaviour, failure modes, and system interactions in non-compliant or untested configurations. A reasonable and reliable judgement in these circumstances requires specialist knowledge gained from observing both successful and unsuccessful fire tests, as well as a technical understanding of test methodology and failure criteria.” - BB7 Consulting LTD
Retrofit / refurbishment / alterations
Some respondents highlighted the need for additional guidance in relation to refurbishments and retrofits. Areas mentioned included:
- Retrofitting stair lifts in a communal stair, such as in sheltered housing/four in a block, where this may impact on stair widths, obstacles on the escape route and the sterility of a protected zone.
- Avoiding relying on compartmentation assumptions for retrofits and conversions.
- Providing clearer guidance on fire risk in retrofit and refurbishment projects, particularly where partial updates are permissible.
- Addressing Change of Use conversions, e.g. private dwellings to social housing, which can cause fire safety considerations, for instance, where AFSS is not installed at the time of construction.
- Outlining expectations for existing building retrofit works to aid consistency, e.g. external retrofit of existing buildings and links between structural integrity.
- Expanding guidance on the interaction between sustainability upgrades (retrofit insulation, cladding replacement) and fire spread risk.
- Providing standard templates for Fire Safety Design Summaries (FSDSs) alongside clear intrusive investigation protocols where existing construction records are incomplete, particularly for conversions and retrofit projects.
Building approaches / principles
The need for performance-led approaches, and to retain scope for performance-based system solutions, was raised by a few respondents, including that the UK government's Real Fires project be reviewed as part of updated guidance which gathers evidence on building performance in fires.
Other points raised by a few respondents included limitations in overreliance on compartmentation assumptions, expanding on building protection, agreement that life safety should be the paramount objective and distinguishing between outcomes in fire safety and sustainability, e.g. recognising that fire protection systems themselves carry carbon implications that should be considered.
The ‘golden thread’ of information was raised by a few respondents, for instance:
- Mandating that the golden thread exists, so people operating buildings understand their nature and do not conduct later works with negative impacts.
- Recognising the alignment between Passivhaus and the golden thread.
- Golden thread documentation standards for higher-risk buildings can provide insurers with reliable underwriting evidence, though this is not their intended purpose. It also should be noted that the terms ‘Higher Risk Buildings’ and ‘golden thread documentation’ refer to existing provisions under the Building (Safety) Act 2022 which is not applicable in Scotland.
One respondent felt the existence of HOF (Human and Organisational Factors) methodology should be noted, its application to fire safety and its role in understanding why physical safety measures fail to prevent fires.
Another respondent highlighted that while the THs address measures that should be made where internal angles (not more than 135 degrees) are made with protected zones, the THs do not outline the same principle where there is an internal angle between two separate dwellings. Internal angles occur on flatted developments with unprotected areas of two opposing flats in very close proximity to each other. Clause 23.2 and Figure 33 of BS 9991: 2024 were felt to deal with this issue well.
Other views
The need for greater guidance on smoke toxicity was raised by a few respondents, for instance, that a standardised methodology is needed to test and classify the relative toxicity of smoke produced by construction products during a fire. One respondent felt greater attention should be paid to the post-fire behaviour of structures.
“The issue of smoke toxicity should be reviewed as a qualitative question of smoke, beyond the quantitative measure of smoke in BS 13501-1 Reaction to Fire classification in s1, s2 and s3. The issue of toxic smoke generated by combustible construction can be separated from the toxic smoke generated by contents of compartments. The aim being to minimise the contribution of the compartment construction to smoke toxicity. Which can re-enter other compartments beyond the compartment of fire origin when smoke has breached windows and doors, either internally in the building, or as a consequence of an external wall fire.” - Individual
Several respondents identified issues they felt were not new but were currently missing. These included:
- Escape signage.
- Low level roofs.
- Maglocks on all escape routes / control access in schools.
- Delayed egress options, such as those used in shops to deter shoplifters.
- Fire load and building classifications.
A few respondents raised the need to address roles and responsibilities, though this is part of a wider conversation regarding industry and professional competence and not necessarily a requirement of building regulations. Views included:
- Requiring information to be provided at handover to the person responsible for fire safety, similar to Regulation 38 requirements in England and Wales, for instance.
- Increased training and awareness of compartmentation breaches and requiring fire stopping to be an accredited module for tradespeople linked to mandatory training.
- Clarification of professional responsibility and where that responsibility ends.
- Clarifying that fire safety should only be undertaken by those with the appropriate knowledge, expertise and training.
- Requiring duty holders or fire risk assessors to identify which fire safety measures in a building are Safety Critical Elements (SCE). This respondent suggested:
“Introduce mandatory SCE identification for defined building classes (non-domestic multi-occupancy buildings, traditionally constructed buildings, higher risk buildings) as a required output of a suitable and sufficient fire risk assessment. Each identified SCE must be documented in the Fire Safety Record with its current Green/Amber/Red health status using the classification criteria set out in prior submissions to this Call for Evidence. AMBER status requires a time-bound action plan; RED status requires immediate notification to the BSD verifier and SFRS. This is the most significant single new topic this review could introduce: it converts fire safety assessment from a binary compliance exercise into an ongoing barrier health management system.” – Organisation
Q2a. Are the current mandatory standards and supporting guidance robust, effective and clearly understood to deliver the intended safety outcomes?
| Respondent type | Sample size (n=) | % Yes | % No | % Not sure | % No answer |
|---|---|---|---|---|---|
| All respondents | 57 | 23 | 32 | 26 | 19 |
| All answering | 46 | 28 | 39 | 33 | - |
| Individuals | 11 | 27 | 55 | 18 | - |
| Organisations: | 35 | 29 | 34 | 37 | - |
| - Trade Association | 6 | 0 | 33 | 67 | - |
| - Local Authority | 7 | 43 | 14 | 43 | - |
| - Professional Body | 4 | 50 | 0 | 50 | - |
| - Consultancy | 5 | 20 | 40 | 40 | - |
| - Construction Industry | 3 | 67 | 33 | 0 | - |
| - Manufacturer | 3 | 33 | 67 | 0 | - |
| - Housing Provider / RSL | 2 | 50 | 50 | 0 | - |
| - Other | 5 | 0 | 60 | 40 | - |
Among those answering Q2a, two fifths (39%) disagreed that the current mandatory standards and supporting guidance are robust, effective and clearly understood, while 28% agreed and 33% were unsure. Individuals and organisations had similar levels of agreement (27% and 29% respectively); however, individuals were more likely to disagree (55%) than organisations (34%). Views varied by organisation type, with the highest agreement from construction industry organisations (67%), while no Trade Associations and 20% of consultancies agreed.
Almost seven in ten respondents left an open comment at Q2a. The most prevalent themes were that the standards and guidance required greater clarity, suggestions for improvement and that the standards are robust. Suggested improvements are incorporated at Q2c, which directly relates to this issue.
More clarity needed
The need for greater clarity, particularly in the guidance, was highlighted by several respondents. Areas where more clarity is felt to be needed include smoke control system performance, whether apart-hotel, serviced apartments and short-term lets are considered domestic or non-domestic, competency, and views on fire strategies. Other comments related to the status of the guidance, for instance, that interpretation, evidence thresholds and practice application were not clear enough or that determining compliance requires navigating and interpreting multiple interconnected clauses and conditions, leading to scope for differing interpretation.
“The supporting guidance is not always clear or easy to interpret. Many parts of Section 2 rely on broad wording that leads to differing interpretations. While the functional standards work well in principle, practitioners often find the examples of compliance ambiguous, which can lead to inconsistent verification outcomes. More clarity and more diagrams would improve understanding significantly.” - McTaggart Construction
The standards are robust
Several respondents highlighted that they felt the guidance and standards were robust, particularly for low-risk buildings. Comments tended to be brief, but included that they were ‘broadly effective’, ‘generally’ or ‘broadly’ robust and that the TH was ‘usable and reasonably clear’. One respondent felt the approach whereby guidance provides potential routes to compliance while still allowing for innovative solutions to unique building design challenges allowed for flexibility, supporting a diverse build environment.
“LABSS considers that the current mandatory standards and supporting guidance are generally seen as robust and when applied as intended can meet the requirements of the functional standards.” – LABSS
Limitations – not considered robust, effective or clearly understood
Views that the standards and THs were not robust, effective and clearly understood were given by some respondents, for instance, due to complexity (e.g. guidance on locks), navigational issues or the need for frequent collaborative interpretation to achieve consistency. One respondent noted that finding a specific recommendation often relied on prior knowledge of the THs ‘internal language’ due to the splitting of information between regulations and the standards. A few respondents highlighted growing dependency on third-party consultants to ensure compliance or stated their staff regularly need to consult with colleagues, technical leads or external partners to reach a shared understanding of certain standards. Clause 2.9.24 was felt to repeat the guidance in 2.9.17 and 2.14.8, and the respondent who highlighted this felt the clause served no real purpose and was better placed in the introduction to Section 2.
“Staff often require extensive cross-checking between Technical Handbooks, procedural guidance, and BSD directives to maintain consistent interpretation. Ensuring alignment with the mandatory standards frequently involves navigating multiple documents and reconciling differences in phrasing or intent. Consistency is therefore heavily dependent on internal verification checks, consortium group discussions, and Scottish Building Advisory Service/LABSS engagement - demonstrating that clearer or more consolidated national guidance is needed to reduce the burden on verifiers and minimise discrepancies.” - Aberdeenshire Council - Building Standards
Limitations – compliance is through the handbooks
A discrepancy between the standards and the handbooks was noted by some respondents, particularly in relation to compliance. For instance, the interaction between the standards and the THs was not always seen as clear or straightforward. It was noted that the THs have been de facto regulations that can lead to ‘compliance by rote’, that the THs do not comprehensively address the fire safety management of existing traditionally constructed buildings in continued use, that the THs are guidance, not legal requirements, which can lead to uncertainty and that the standards can be overlooked by the guidance.
“There are some anomalies in the documents. Whilst it is generally considered that following the THs means compliance (even though strictly in law it doesn't), it is not necessarily the case that all intended safety outcomes will be achieved. For example, in the case of firestopping requirements, the THs permit services 40 mm and under not be fire stopped. Whilst it may imply that they still should be sealed, it doesn't specifically require this in the specific section. I have experienced over the years many cases where the contractor thinks this OK. In fact, the THs permit any number of 40 mm penetrations, and they don’t have to be suitably fire stopped. So full compartmentation or separation is not achieved.” - Individual
Limitations – not suited for High Risk / complex buildings
Some respondents highlighted they felt the guidance was limited in relation to complex or HRB types or design scenarios. For instance, it was felt in this regard that it was not always clearly understood, that project teams regularly encounter questions about evidence thresholds and acceptable departures from standard guidance, or that the guidance was too rigid and not the most appropriate means of meeting the standards.
“However, for more complex buildings, retrofits and non-standard uses or façade systems, the Technical Handbooks can be difficult to apply and increases the probability of differing interpretations to the specific recommendations and/or scope of the guidance documents itself.” - Sweco
Limitations – guidance treated as a ‘checklist’
The guidance was felt by some respondents to sometimes be treated as a ‘checklist’, leading to a ‘tick box’ or minimalist approach to compliance. One respondent felt it could lead to reliance on simplistic combustibility classification as the performance metric, while another felt designers could focus on meeting the guidance rather than addressing the underlying standards. More emphasis on a holistic, performance-based approach was recommended to address this.
“There is widespread misunderstanding that the standards represent a complete safety solution, rather than a minimum level of provision. This is compounded by the expanded guidance, which can give a false sense of security.” - Astute Fire Engineering Ltd
The standards are clear and understood
Conversely, some respondents felt the standards and the relationship between the standards and guidance were clear and generally understood by practitioners. In particular, the intent behind the standards was felt to be clear.
“Verifiers are clear on the requirement that it is the Standards in the building regulations that must be met and that the supporting guidance provides at least one way in which the Standard may be met. Accordingly, alternative solutions from that in the guidance may be acceptable provided they meet the relevant Standard of the building regulations. We also consider that the vast majority of designers also recognise the points made above.” - City of Edinburgh Council - Building Standards
Other perceived limitations
Conflicts with BS standards were perceived to impact robustness, effectiveness and understanding of the mandatory standards and guidance, according to a few respondents. For instance, one respondent noted that the guidance was not updated following the introduction in 1987 of BS 476 Part 7 standards, which was given a water-cooled frame to test thermoplastic materials and products, which changed the effect of Class 0. Also, the THs permit travel distances to be measured to compartment walls, but the guidance in BS 5588 does not recommend fire and smoke dampers in such walls, nor does its successor BS 9999.
A few respondents felt the standards did not address organisational conditions. Points here included the need to consider:
- The performance of the whole building ecosystem, as well as theoretical and laboratory performance.
- Organisational conditions that determine whether physical outcomes, such as buildings being designed so that fire spread is resisted, occupants can escape safely, and firefighters can operate effectively, are achieved and maintained over the building’s operational life.
- Clause 2.9.12 is being applied by NHS Scotland Assure to ward corridors serving bedrooms, which means ward corridors are being treated like protected corridors and necessary (life safety) clinical equipment is excluded unless justified.
Issues with FRAs not having the desired impact were also raised by a few respondents, impacting the effectiveness of the standards and guidance. For instance, it was noted by one respondent that the FRA methodology did not require assessment of the specific physical features in the Glasgow Union Street fire in 2026, leading one respondent to suggest the intended safety outcome of Section 2 is not being achieved for traditional buildings. Another felt the TH is often treated as a complete fire safety solution rather than a minimum standard, and that its prescriptive, risk-based thresholds are founded on broad classifications and historical assumptions that might not reflect actual levels of risk in modern buildings. They suggested simplifying the guidance to set out recommended baseline measures only, with any departures justified through a building-specific fire strategy prepared by a suitably qualified chartered fire engineer.
Two respondents highlighted the need to adopt evidence-based, science-backed approaches, with one stating the DTH was updated to include two escape stairs over 18m for political reasons rather than being grounded in science and safety. In doing so, it was felt that the guidance was not updated to account for smoke control, leading to a real possibility that a single stair building with smoke control to protect the stair is safer than a two-stair building without smoke control to protect the stair. A further respondent felt there were too many defective and badly installed smoke ventilation systems in Scotland for the guidance to be effective as it is currently configured.
Q2b. Are the mandatory standards and supporting guidance consistently applied to deliver the intended safety outcomes?
| Respondent type | Sample size (n=) | % Yes | % No | % Not sure | % No answer |
|---|---|---|---|---|---|
| All respondents | 57 | 14 | 46 | 19 | 21 |
| All answering | 45 | 18 | 58 | 24 | - |
| Individuals | 11 | 18 | 73 | 9 | - |
| Organisations: | 34 | 18 | 53 | 29 | - |
| - Trade Association | 5 | 0 | 60 | 40 | - |
| - Local Authority | 7 | 43 | 14 | 43 | - |
| - Professional Body | 4 | 25 | 50 | 25 | - |
| - Consultancy | 4 | 25 | 75 | 0 | - |
| - Construction Industry | 4 | 25 | 50 | 25 | - |
| - Manufacturer | 3 | 0 | 67 | 33 | - |
| - Housing Provider / RSL | 2 | 0 | 50 | 50 | - |
| - Other | 5 | 0 | 80 | 20 | - |
Among those answering Q2b, 58% disagreed that the mandatory standards and supporting guidance are consistently applied in a way that delivers the intended safety outcomes, while 18% agreed, and 24% were unsure. While 18% of both individuals and organisations agreed, more individuals disagreed (73%) compared to organisations (53%). Organisations most likely to agree included local authorities (43%), Professional bodies (25%), consultancy (25%), and construction organisations (25%), while trade associations, manufacturers, housing providers / RSLs, and other organisations agreed. Despite these differences, all types of organisations recorded higher levels of disagreement than agreement, except for local authorities.
Over seven in ten of all respondents left an open comment at Q2b. The most prevalent themes were that there was inconsistency between verifiers / local authorities, suggestions for how consistency can be improved, and evidence of inconsistency, either in certain areas or more generally. Suggestions for improvement are incorporated into Q2c.
Inconsistency between verifiers / local authorities
Several respondents raised differing interpretations and approaches to verification by verifiers, in or across local authorities, or between verifiers and other personnel, such as consultants, involved in the design and approval process. At times, this was attributed to differences in understanding rather than an issue with the standards or guidance, though ambiguity was also highlighted as contributing to this situation.
Such inconsistency was felt to lead to uncertainty for designers and occasional redesigns that are not perceived to materially improve fire safety, differing levels of fire safety being applied, additional time and cost required to resolve differing views or pay for consultants, and undermining confidence in the building warrant process. For instance, one respondent noted experienced verifiers had recommended design solutions, and even untested construction details as an alternative to the tested fire resisting details proposed, e.g., using 2 layers of 15mm fire board. This respondent felt such advice was inappropriate and recommended the THs clarify the remit of verifiers.
Differences in how verification was approached in certain circumstances were noted by these respondents, such as:
- Some respondents mentioned differences when interpreting ‘Alternative Solutions’, such as the acceptability of alternative fire safety measures or compensatory features, whether escape past a void edge is viewed in its entirety with alternative escape routes taken into consideration or guidance set out in BS 9999 not being accepted as an alternative approach.
- In relation to complex buildings, existing buildings or buildings undergoing conversion, such as in relation to fire resistance requirements.
- A lack of clear ‘cross-verification’ between distinct aspects of the guidance, such as linkages between smoke control system design and the overall fire engineering approach.
- Differences over whether the NDTH or DTH are applied to certain building types, such as student residential, short-term lets, serviced apartments, B&Bs, and Apart Hotels.
- When assessing fire engineering solutions and designs.
- For external fire spread assessment approaches, especially in mid-rise retrofits.
- When evaluating minor domestic works where risk increases are minimal.
- Insufficient alignment between the Building (Scotland) Act 2003 and the Fire Safety (Scotland) Act 2005 leading to inconsistent interpretations during consultations with SFRS.
- During approval processes, with early consultation specified in the THs in relation to fire safety engineering varying between verifiers, with some willing to engage before warrant application and others not.
“Our members have highlighted that there are clear inconsistencies in interpretation across local authorities and verifiers. Multiple instances exist where two verifiers assessing identical circumstances have reached opposing conclusions on compliance, creating significant uncertainty for developers operating across local authority boundaries. This variability undermines confidence in the building warrant process.” - SPF
Inconsistency in certain areas or across the board
Broader inconsistency across those involved in fire safety or in the standards and guidance, compared to the theme above, was noted by several respondents. However, there was some overlap between the above theme and this one, such as verifiers being mentioned and concerns that the equivalent levels of safety were not being delivered.
In addition to verifiers, application of the standards was felt to vary between practitioners, e.g. designers, fire engineers and contractors. After verifiers, designers were the most frequently mentioned group by respondents as having inconsistent practice.
Differences in how the standards were being interpreted were commonly mentioned as resulting in inconsistency. However, a wide range of other reasons were given for why variation may occur, notably relating to building-related differences, practice-related differences and the mandatory standards.
- Practice related: how standards are interpreted, quality of workmanship, e.g. poor installations of smoke control systems, ‘cherry picking’ the best parts from various standards and guides to suit their position, competence and attitude to risk, insufficient consideration of whether prescriptive application of the standards is appropriate for the specific building, complex fire engineered solutions being accepted without transparent or testable justification.
- Building related differences: approaches taken, challenges on site, building types, height and use, proximity to boundaries and wall construction type, if works involved refurbishment or across sectors.
- Mandatory standards related: conflicting or ambiguous wording generally causing uncertainty, inconsistencies in external fire spread noted in the THs and BR 187, a lack of supporting evidence given for fire performance in the application of boundary conditions.
For instance, one respondent felt the guidance was not consistently applied for historic buildings as it was necessary to rely more on interpretation than explicit guidance for assessment. Another, with experience of working in the fire protection industry over many years, reported having seen many examples of measures being used that, on the face of it, appeared compliant but would be unlikely to achieve the required safety, perceiving a disconnect between specification or design and installation.
“The application of the guidance is highly situational, depending on multiple interacting factors such as building height and use, proximity to boundaries, and wall construction type. It also requires consideration of how different elements of the construction respond to different fire exposure conditions (for example, from inside the building and from the external environment). Where determining compliance requires navigating and interpreting multiple interconnected clauses and conditions, there is increased scope for differing interpretations. This, in turn, makes consistent application more challenging across projects and among those applying the guidance, and reinforces the potential for variation in how the guidance is applied in practice.” - Kingspan Insulation and Kingspan Insulated Panels
There is consistency
Conversely, several respondents felt the standards were largely consistently applied, particularly where they were understood or where the guidance was clear, well defined and reflective of realistic design and construction practices. A few of these respondents noted full consistency was not achievable for reasons such as those raised in the theme above. One respondent noted consistency had improved because of the work of LABSS and the SBSH through CTWG, Information Papers etc.
“No concerns were raised by our members regarding consistency of application.” - Scottish Federation of Housing Associations
Enforcement challenges
Two respondents highlighted inconsistency with enforcement. One noted that the SFRS enforcement resource had been subject to significant constraint, citing evidence to indicate that current enforcement of FRA quality and the adequacy of fire safety measures is not producing consistent outcomes across the stock of affected buildings. Inconsistency could therefore be introduced because of differing enforcement responses, such as failure to enforce warnings, as was highlighted by the other respondent. They noted that in the case of Cameron House, a formal warning letter had been issued, but no enforcement action was taken to compel it.
Q2c. Where should improvements be focused when reviewing the mandatory standards and supporting guidance?
Three quarters of all respondents left an open comment at Q2c. Recommended improvements given at Q2a and Q2b are incorporated here. The most prevalent themes were comments on compliance and evidence, supporting consistency, and a focus on strengthening the guidance.
Comments on compliance and evidence
Several respondents gave views on compliance or evidencing appropriate building performance and resilience. Recommendations to improve the guidance on compliance included:
- Clarifying expectations of evidence and submission quality.
- Introducing a three-tier compliance route: simple/conservative for low-risk buildings, legislated performance criteria for mid-risk buildings where specific ‘tenability limits’ (e.g. smoke visibility, heat levels) are written into legislation, and full fire engineering being mandatory for HRB.
- Mandating the provision of documentation, calculations and test results to demonstrate the performance and reliability of fire safety systems, including under compromised conditions.
- Clarifying minimum standards versus performance outcomes.
- Using an evidence-backed, science-based approach to demonstrate compliance, using independently verified system tests that test the performance of products and components in a system, rather than solely relying on the technical characteristics of the individual products alone.
- Providing clearer routes and evidence requirements for alternative approaches.
- Providing competence and evidence requirements where fire engineering is needed.
- Requiring mandatory bodies to confirm there are robust checks in place to ensure compliance is more than a ‘checklist’ approach.
Comments on benchmarks and certifications included two respondents who felt there should be benchmark examples, with one of these calling for the development of quantifiable safety benchmarks to support fire engineering.
On certification, it was felt that third-party certification for any building deemed a potential life risk could be introduced, as could a statutory certification regime like that introduced in Ireland.
A few respondents noted challenges with tests versus real-world evidence, for instance, systems as-built rarely aligning with test standards or measures needing to be regularly updated to take account of changes such as emerging technologies.
Focus on supporting consistency
Improvement should focus on enhancing consistency, according to several respondents. Suggestions for improvement were raised by these respondents, as well as by several at Q2b and incorporated here. These suggestions included:
- Stronger national interpretation notes.
- Developing a standardised smoke-toxicity classification system.
- Clearly separating legal requirements from guidance, making the mandatory standards more prominent, and being clear when something is outside the guidance.
- Better contextual information, clarifying verifier expectations, to reduce ambiguity.
- Improved consistency between the DTH and NDTH[1].
- A clearer link between Regulation 7, Schedule 4 and clause 2.0.4.
- Introduce a formal mechanism to identify and resolve inconsistent interpretations across verifiers or improve consistency in verification processes.
- Strengthening consistency without undermining professional judgement.
- The SBSH acting as a central resource for consistency and escalation.
- More standardised approach to Fire Safety Design Summaries (FSDSs) to help ensure key assumptions, limitations and decisions are clearly recorded in a way that is easy to understand.
- Fully removing BS 8414 from the THs for higher risk building types given fire safety concerns regarding the continued use of BS 8414 / BR 135 route to compliance.
- Developing standard schedules of evidence required at warrant, interim inspection and completion stages.
- Avoiding negative liability where the functional standard has not been met.
Focus on improving or strengthening parts of the guidance
A varied range of areas was identified as in need of improvement in the guidance. These points included the need to address:
- Traditional building FRA methodology.
- Means of escape, fire spread and fire service access.
- CPA implementation.
- Modern technologies (see ‘Modern technologies’ in Q1b) and Modern Methods of Construction (see Q1b, ‘Building materials or features’).
- Commonly used construction typologies.
- Cavity Barriers, both Closed and Open State.
- Cross-tenancy hazard coordination protocol.
- Whole wall system performance, interface detailing, cavity barrier insulation, and on-site verification requirements should be considered in addition to material classification (Euroclass ratings) in guidance on cladding specification.
Areas where it was felt the guidance could be strengthened included:
- The relationship between the mandatory functional standards and supporting guidance so the primacy of the standard is unambiguous.
- Reducing the number of functional standards.
- Introducing mandatory FSDS – every building warrant should require a document that explains why the chosen guidance meets the Mandatory Standard, ensuring the ‘intent’ is considered.
- Mandating a void network assessment as a required part of the FRA.
- Establishing policy intent that any future Scottish Building Safety Case legislation will include the HOF analytical layer from the outset.
- Stronger treatment of retrofit, façade works and compartmentation.
- Independent escape for vulnerable occupants (see Q5a).
- Firestopping.
- Only allowing exclusive adoption of the NDTH, so standards are not mixed and matched, unless a deviation is supported by a proper fire-engineered solution.
Greater clarity / definitions
Views on clarity were raised by several respondents at Q2c, and several at Q1b and several at Q9, both incorporated here. These ranged from broader views about the need to simplify language used in the standards and guidance, to calls for greater clarity on specific points. More general recommendations of ways to achieve greater clarity included:
- Addressing overlap between several standards, which can make intent less clear.
- Reviewing vague or subjective language, particularly around existing buildings, e.g. one respondent recommended the review should ensure that the definition used for traditionally constructed buildings in Section 0 General is consistently applied throughout Section 2 and all associated guidance - including the Guide to Conversion of Traditional Buildings, the Practical Fire Safety Guidance for Existing Non-Residential Premises, and the void network assessment clauses proposed in HOF-BSD-BRIEF-2026-001.
- To consider elevating core terms to clearer, referenced definitions, helping ensure key terms are used consistently and can be cross-referenced.
- Clarifying the underlying intent of each standard, e.g. stating in its introduction whether its primary objective relates to life safety, property protection, or both.
- Updating the mandatory standards to reflect current standards and technologies and remove outdated references.
“There have been multiple revisions to the fire section of the technical handbooks since the introduction of the 2003 Act. It would be helpful to take stock and understand if some of these revisions merit updates to other standards/guidance that may be impacted by these subsequent changes. By way of example, the introduction of suppression in flats is likely to influence the extent of a fire growth and spread in a flat. Prior to suppression being introduced, it is widely considered that fires in flatted developments generally do not spread beyond the flat of origin. That being the case, does the presence of suppression mean that updates to firefighting requirements should be less onerous? For example, fire-fighting vehicle access provision to elevations” - City of Edinburgh Council - Building Standards
“The current guidance can sometimes be overly technical, repetitive, or open to varied interpretation. Simplifying the language, improving structure, and providing clearer explanations and examples would help ensure that the guidance is accessible not only to experienced professionals but also to newer practitioners. Clearer wording would support more consistent decision making, reduce reliance on interpretation through discussion groups, and minimise unnecessary escalations or resubmissions.” - Aberdeenshire Council - Building Standards
Comments seeking greater clarity in specific parts of the standards and guidance not mentioned elsewhere in the report included:
- When fire engineering analysis is expected versus when prescriptive solutions suffice.
- Fire strategy documentation, including minimum content requirements.
- When sprinklers or other suppression is expected, along with associated competence / third-party certification requirements, e.g. clarity on misting compliance.
- Quantify Minimal differential movement and Greater differential movement in 2.1.14.
- Clarity in the treatment of existing construction in conversions, external wall detailing at junctions and cavity barrier installation.
- Removing outdated references and areas of conflict, such as in relation to the question of retrofitting intumescent products to existing doors and third-party certification on all projects with a higher sleeping risk.
- Including reference to Glass Reinforced Plastic (GRP) or thermosetting plastics in 2.5.3 on Plastic Glazing to clarify the status of, for example, GRP rooflights.
- Clarifying the use of Mag locks and hotel-style locks, i.e. security concerns versus escape and fire service access.
- Including large-scale, clearly illustrated examples of compliant undercloaking details.
- Including diagrams and construction detailing showing basic requirements for fire-protecting elements and junctions.
- The bulleted section on Junctions with roof (2.1.15 NDTH) has been laid out, separating the second bullet into two bullets, meaning it does not make sense.
- Clarification on cavity barrier performance at party wall junctions, specifically in Annex 2.A – Fire Resistance Duration, with additional sections added for horizontal and vertical barriers in these locations.
- Clarifying how the standards and guidance apply to caravans and mobile homes, for instance, one respondent made recommendations for how to address ‘unclear and outdated’ guidance outlined in Annex 3 ‘Holiday camping and caravan sites’ on fire spacing for caravans and motorhomes.
- Giving clearer guidance on the differences between public access and non-public access buildings, including grey area cases such as mixed-use buildings, community facilities, shared entrances, and partially public circulation spaces.
- To reconsider the caveats outlined in the ‘additional information’ section, which appear counterintuitive for various scenarios.
- To determine whether the heightened risk profile of void-network buildings is determined by the date criterion, the construction method criterion, or a functional assessment of void network connectivity and cavity barrier health.
“The reference to the 2009 LPC rules is outdated, given the updates to BS EN 12845 post that data. At the same time, we have always found it hard to understand the references to carbon dioxide systems, powder systems and low expansion foam in a section on compartmentation. Perhaps these systems would be relevant to places of special fire risk as highlighted in 2.1.8, rather than area-wide protection, and a comment to that effect may offer some clarity.” - Business Sprinkler Alliance
Calls were made for specific definitions to be provided. These included:
- Cavity barriers.
- Compartmentation.
- Fire barriers.
- External wall, i.e., indicate if it includes the inside plasterboard or not.
- Places of special fire hazard – it was felt that this was mentioned in Appendix A, but not in Section 2, and that it did not consider other fuel sources such as batteries or other electrical equipment.
- The terminology for fire ratings – short, medium and long.
- Separation distances.
- Combustible and non-combustible, e.g. one respondent requested the term ‘non-combustible’ be defined in statutory guidance: ‘A material of European Classification A2-s1, d0 or A1, classified in accordance with BS EN 13501-1:2018’.
- Linings and internal linings.
- ‘Same occupation’ (in 2.2.4 Combustibility).
- Caravans, mobile homes.
“Clearer definitions and diagrams, especially around cavities, barriers, penetrations and fire strategy” - British Automatic Fire Sprinkler Association
Other points raised on definitions included:
Two respondents who had felt Item 0.8.3 (repair definition) required clarification, with one believing legislation remains open to interpretation, creating uncertainty over whether partial external cladding repairs trigger full elevation upgrades to current standards. Clarification was also sought by one respondent on the legislative programme to define the term ‘High Risk Buildings’.
Another respondent felt the term ‘traditionally constructed building’ had been introduced through schedule 5 of the building regulations rather than through either the Act or a revision to Regulation 2 of the Building (Scotland) Regulations 2004. They felt this had ‘introduced confusion’ into Standard 2.5 due to both its similarity to the existing defined term ‘traditional building’ and the assertion that the defined terms retain the same meaning as traditional building.
Views on formatting and layout of the guidance
Next most prevalent were comments about the formatting and layout of the guidance, each mentioned by some respondents. There was some overlap between these themes and themes described above, such as Greater clarity / definitions. Views on the formatting of the guidance were also raised at Q1a and Q9, with those views incorporated here.
Suggestions to improve the format of the guidance, or highlighting the need for this, were raised by some respondents at Q2c, as well as some at Q1a and some at Q9 incorporated here. Views ranged from the need for a full restructuring of the THs, to calls to make the material more accessible, for instance, through increased use of visual aids. It was noted that at present, users are required to go back and forth between the text and different guidance documents to find relevant sections, which could be time-consuming and cause confusion and uncertainty. There were calls to ensure the guidance is practical and easy to use, such as by reducing language complexity, using more diagrams, examples and improving linkages to relevant information. Other suggestions included using more figures, explanations and exemplars.
Specific comments on improving the structure of the guidance included:
- Ensuring ease of navigation while retaining scope for performance-based system solutions.
- Having separate documents specifically dealing with low-rise housing and flatted dwellings.
- Addressing the gap between Section 2 and the Fire (Scotland) Act 2005 operational guidance, particularly where their interaction is the most complex, such as for traditionally constructed multi-occupancy buildings.
Some other respondents at Q2c called for more worked examples or case studies. Suggestions included practical examples or scenario-based guidance, shared case studies, and worked illustrative examples. One suggested case studies and articles could also be published in relevant professional magazines. Another suggesting using certain fires as case studies, for instance, Alcorcón, Madrid (April 2025), as a ‘worst case scenario’ for emergency responders in enclosed spaces, and Incheon and basement fires in Suwon, South Korea (2024–2025), e.g. a spontaneous EV fire in a basement took eight hours to extinguish, destroyed 140 cars and displaced hundreds of residents for weeks.
Examples provided by respondents where such approaches would be beneficial included:
- Demonstrating acceptable solutions for common scenarios, e.g., office-to-residential conversion, hotel extensions.
- Demonstrating properly designed and installed smoke control systems.
- Effective application of guidance to more complex buildings, including historical typographies.
- Reflecting the wide range of different vulnerabilities, disabilities and complex needs which can affect an individual’s ability to interact with the built environment (the London Olympic facilities were cited as a helpful example to draw from).
Prominent positioning and signposting to other standards were highlighted by some respondents at Q2c to improve navigation between relevant sections. A need to cross-refer to other guidance was highlighted, with one respondent suggesting the guidance should explicitly state it was acceptable to follow such guidance. Specific guidance where explicit linkages should be made, according to respondents, included: EN 12101-2, -9 and -10; BS 9999 and BS 9991; and BS 7346 Part 8.
One respondent suggested combining Standards 2.6 and 2.7 and aligning them with the rest of the UK. The need for stronger alignment between fire engineering approaches and the standards was recommended by another.
“Holistic approach – BSD and SBSH guidance will often highlight the need for a holistic assessment of a design, this requirement will routinely need to cover many mandatory standards, such as 2.2, 2.3, 2.4, 2.6 and 2.7. It would be clear if the links between standard could be clearer and more logically structured.” - LABSS
“The current guidance landscape requires that person to consult the Technical Handbook, the Practical Fire Safety Guidance for Existing Non-Residential Premises, the high-rise domestic guidance, and the Fire (Scotland) Act 2005 operational guidance separately — without any cross-referencing framework that explains how these documents work together.” – Organisation
Focus on strengthening staff competency
A focus for the Section 2 review should be to strengthen workforce competency, according to some respondents. Views included that:
- Competency should be more clearly articulated in the guidance.
- There is a need to define responsibilities and accountability in regulations.
- Competence for fire engineering should be defined.
- A review of Section 5 (Liability) should occur and the ‘legal shield’ qualified, so that if a designer follows the THs but ignores a known site-specific risk, they should not be immune from liability.
- Improvements should focus on the competence of those submitting building warrant applications and those undertaking construction work, e.g. guidance that supports a competent building warrant submission related to more complex submissions, such as including fire performance requirements.
One local authority called for any revisions to be mindful of verifier capacity and resourcing, though it did not go into further detail.
Focus on more complex situations
Some respondents called for an improvement focus on dealing with more complex situations, such as HRB, non-standard building types, conversions / retrofits and historic buildings. Specific suggestions included:
- Reviewing the guidance on conversions, particularly for listed buildings.
- Clearer identification of the limits of prescriptive guidance, particularly for complex or non-standard building types, with signposting to alternative recognised design standards or specialist fire engineering approaches where appropriate.
- Stronger treatment of retrofit, façade works and compartmentation.
- Ensuring that the definition of HRBs does not default to height-only criteria that exclude Scotland's Victorian heritage commercial and residential stock.
“It would be advantageous to include distinctions between new build and existing buildings, and historic buildings, and for a stronger emphasis on early investigation and understanding of historic buildings, ultimately to ensure the highest possible levels of fire safety. However, it is important that a standardised approach here does not lead to standardised solutions. In the case of historic buildings, each needs to be assessed on its own merit.” - National Trust for Scotland
Focus on enforcement
An improved focus on enforcement action was recommended by a few respondents. Views included:
- The need for more robust enforcement action when approvals have not been followed.
- That clearer rules are required, e.g., prescriptive requirements, to improve consistency and enforcement.
- The need to remove BS 8414 as a route to compliance to strengthen enforceability.
Focus on performance-based approaches
A few respondents suggested a focus on strengthening performance-based approaches and routes. Ideas for how to achieve this included giving clearer performance and tenability criteria where performance-based approaches are used so alternative solutions can be assessed objectively, clarifying verification boundaries, strengthening definitions, and better distinguishing between requirements and guidance.
Contact
Email: buildingstandards@gov.scot