M8 Junction 16 and 17: Inspection Defect Report: EIR release
- Published
- 8 May 2018
- Topic
- Public sector, Transport
Information request and response under the Environmental Information (Scotland) Regulations 2004.
FOI reference: FOI/18/01038
Date received: 4 April 2018
Date responded: 1 May 2018
Information requested
Information relating to a road your authority is responsible for maintaining. Specifically, my query relates to the M8 heading west bound between junctions 16 and 17.
1. A copy of your current road maintenance policy relating to that road. Please send me the full policy, but this should include details of the intended frequency of road safety inspections, how these inspections should be conducted and the maximum time between identification of a defect and repairs being carried out.
2. A copy of the road repair history for that road over the past year. Again, please send me the full road repair history, but this should include:
dates of all safety inspections between 1 January 2018 and 28 February 2018
details of how safety inspections were undertaken (walked or driven, speed of inspection vehicle etc)
details of all carriageway defects identified, with description, date and time
details of how the authority handled these defects, what repairs were undertaken and the time between the identification of each defect and repair being carried out'.'
Response
This exemption is subject to the 'public interest test'. Therefore, taking account of all the circumstances of this case, we have considered if the public interest in disclosing the information outweighs the public interest in applying the exemption. We have found that, on balance, the public interest lies in favour of upholding the exemption, because there is no public interest in dealing with the same request under two different regimes. This is essentially a technical point and has no material effect on the outcome of your request.
In response to your request, please see attached Annex A which is the Inspection Defect Report for the M8 Junction 16 and 17 for the dates of 1 January 2018 to 28 Feruary 2018. Annex B of this request is the full road repair history over the past year.
Transport Scotland's approach to the maintenance of the trunk road network is set out in the 4th Generation Term Contract for management and maintenance of the Scottish Trunk Road Network and our Road Asset Management Plan. Both documents are available online at the following links;
https://www.transport.gov.scot/media/35900/sw-combi.pdf
Schedule 7: Part 1 of the contract provides an overview of inspections,surveys and defect defect categories and response times.
Schedule 7: Part 2: Section 2.7 of the contract provides details of inspections and their frequency during winter.
Schedule 7: Part 6: Section 3 of the contract details the inspections and their frequency for Structures.
About FOI
The Scottish Government is committed to publishing all information released in response to Freedom of Information requests. View all FOI responses at http://www.gov.scot/foi-responses
- File type
- 2 page PDF
- File size
- 30.2 kB
- File type
- 75 page PDF
- File size
- 2.1 MB
Contact
Please quote the FOI reference
Central Enquiry Unit
Email: ceu@gov.scot
Phone: 0300 244 4000
The Scottish Government
St Andrew's House
Regent Road
Edinburgh
EH1 3DG
There is a problem
Thanks for your feedback