Part 1 Land Reform (Scotland) Act 2003: code of practice

Guidance on procedures for answering local inquiries regarding the Act, including core path plans.


Introduction

1. This Code of Practice provides detailed guidance on the operation of procedures for inquiries which may be held under section 18(4) of the Land Reform (Scotland) Act 2003 ('the Act'). Such inquiries will be held in cases where objections have been made to a draft core path plan and have not been resolved and withdrawn, and in other cases where directed by the Scottish Ministers.

Context

2. Under section 17 of the Act, local authorities and national park authorities ('access authorities') have the duty to draw up a plan for a system of paths ('core paths') sufficient for the purpose of giving the public reasonable access throughout their area. Section 18 of the Act sets out the procedure for the formal public notification and consultation over the draft core paths plan.

3. The Act provides that access authorities have three years after the Act came into effect in February 2005 in which to draw up the core paths plan for their area. The guidance on the Act indicates that during that period, there should be an 'informal consultation' process involving local and stakeholder consultations, to provide the basis for preparing the draft core paths plan.

4. The formal consultation process under section 18 of the Act allows for members of the public to raise objections to the draft core paths plan. If an objection is raised and subsequently withdrawn then access authorities shall proceed to adopt their core paths plan as required by subsection 18(2). The plan preparation process above should have identified and resolved problems as far as possible. Authorities are encouraged to enter into dialogue to ensure that, as far as appropriate, suitable resolutions can be found to any points of formal objection which remain outstanding. This may involve a specified change to the plan, or some other particular resolution, with the objector then formally withdrawing the objection.

5. However, if a valid objection is raised and not withdrawn, then access authorities must not adopt their core paths plan unless directed to do so by the Scottish Ministers. Scottish Ministers will not direct an access authority to adopt its core paths plan without first holding a local inquiry. Ministers may in any other case cause such an inquiry to be held. The local inquiry will investigate specifically whether the core paths plan will, if adopted, fulfil the purpose mentioned in section 17(1) of the Act, that is of being sufficient to give the public reasonable access throughout the authority's area.

6. Under present statutory arrangements the inquiry will be organised to conform with section 265, subsections (2) to (13), of the Town and Country Planning (Scotland) Act 1997. That provides for, amongst other things, the appointment by the Ministers of a person to conduct the inquiry, notifications to involved parties, enabling the use of written statements, and Ministerial orders requiring payment of expenses by any party.

Time Periods for the Section 18 Procedures

7. Prior to any inquiry, the procedures under section 18 of the Act will have followed a standardised sequence with time periods broadly as follows:

a) The formal consultation period on the draft core paths plan, with consultation material and any maps available, will run for not less than 12 weeks, as specified in section 18(1) of the Act. The public notification and consultation material will set out the address to which objections or supporting representations are to be sent, and the date before which they must be submitted if they are to be considered. In exceptional circumstances the authority may agree to accept a late objection, for example where it relates to a matter which is already the subject of objection. If no valid objections are made, or any made are withdrawn by the objector, then the access authority shall adopt the plan.

b) If valid objections are made, access authorities are encouraged to pursue dialogue in order to achieve suitable resolutions wherever appropriate and practicable. This will be a consensual process, and may involve the local access forum. The period allowed would not be indefinite, and generally should extend to no more than 3 months.

c) If, at the conclusion of that dialogue process, valid objections remain, the access authority should then notify the Minister. This notification will be accompanied by two copies of the relevant documentation, including a copy of the draft plan, explanatory supporting material, and copies of the outstanding objections. The access authority should also provide a statement on each objection, explaining its case as to why the objection cannot be accepted or resolved. As far as practicable, this documentation may be provided in electronic format. Scottish Ministers will notify the Inquiry Reporters Unit ( SEIRU) of the need for an inquiry, and forward the documentation to them.

d) A local inquiry will then be arranged to take place as soon as possible thereafter, and the aim would be to hold the inquiry within six months of the notification to Ministers. The inquiry will be held on behalf of the Minister by a Reporter supplied by the SEIRU, and will consider all objections which the access authority has accepted as valid and which have not been withdrawn.

Validity of objections

8. To be valid, an objection will need to -

  • have been submitted in writing within the due time period
  • require a change to the core paths plan

9. When inviting objections and representations, the public notice (7a above) should clearly state these validity criteria, in order to avoid invalid objections being submitted, and should note the provisions of paragraphs 10 and 12 below.

10. The objection must contain the name and address of the objector, and preferably should include a telephone number where contact can be made during office hours. The objection should state:

  • the precise matters to which the objection relates - by reference to specific proposal references in the draft core paths plan, or to the grid references of the relevant proposals, or to an omission of some matter from the plan;
  • the grounds on which the objection is made - with it being important that the full grounds of the objection are presented at this stage; and
  • the details of the change that is sought - ie the revisions (additions / deletions) to the core paths plan that would provide an acceptable alternative or a sufficient proposal.

The authority may provide a standard form for objections, but use of the standard form would not be obligatory.

11. It is for the relevant access authority to consider and decide upon the validity of any objections submitted, on the basis of the criteria in paragraph 8 above. Any one who considers that the authority have failed to comply with this guidance should write to the authority in the first instance. If the matter cannot be resolved the Scottish Public Services Ombudsman may be able to assist in the case. (The Ombudsman office is at 4 Melville Street, Edinburgh EH3 7NS). However, the Ombudsman can only examine and comment on procedural matters, not on the technical merit of the plan or any objections.

12. Within 4 weeks of the closing date, copies of all the objections and representations made to the core paths plan will be available for inspection at the offices of the authority and at any other convenient locations specified by them. This allows objectors to identify others with a common interest so that they can jointly seek to resolve matters with the authority, or present their case jointly at an inquiry. No objection can be treated as confidential.

13. If the authority considers that insufficient information has been made available to explain an objection the objector may be asked to provide additional information. The authority officials shall wherever appropriate meet objectors to correct misunderstandings and to discuss the scope for agreed changes that might result in the withdrawal of objections.

Selecting the appropriate inquiry procedure

14. The form of the local inquiry on the core paths plan will be determined by the Reporter, after consideration of the nature of the objections. In normal circumstances, objections will be considered by the Reporter by means of written submissions and a site inspection. This local inquiry procedure offers a simple and established means of determining fairly, impartially and efficiently objections to the core paths plan.

15. Should the objections raise complicated issues or require discussion, the Reporter may decide that consideration should additionally involve an oral process. In this case, the Reporter appointed to the case will normally opt for a hearings procedure, allowing parties to elaborate on particularly complex or technical issues which could not otherwise easily and effectively be considered by exchanges of correspondence. Such hearings will generally be similar to the arrangements and procedures for planning appeal hearings, as explained further below. It is envisaged that a formal inquiry procedure, involving an adversarial approach achieved by cross-examination, will be required only in exceptional circumstances.

16. The form of inquiry - whether as usual by written submissions, or with a hearing, or exceptionally by a formal inquiry - will rest with and be specified by the Reporter, informed by the views of the parties. The process used will be the most appropriate for considering the matters in dispute and producing a recommendation.

Written submissions procedure

17. All the written material submitted to Ministers under paragraph 7c above, and copied to the SEIRU, will comprise the material for the inquiry by written submissions for the consideration of the Reporter. The Reporter will provide notification of the commencement of the inquiry by written submissions procedure to each objector and to the access authority. The notification to each objector will include a copy of the statement provided by the access authority in relation to that objection.

18. Each objector will then have a period of four weeks in which to provide a written submission, in response to the access authority's statement over why the objection could not be accepted or resolved. This written submission should not repeat the terms of the objection, which are already in the possession of the Reporter. It should generally be restricted to a concise response to the written statement from the access authority, explaining why in the view of the objector the objection should be accepted or suitably resolved. All correspondence in written submissions cases should clearly state the relevant SEIRU case reference number (as noted in the Reporter's commencement letter).

19. Where a party expects to have difficulty in complying with a prescribed time limit, that fact, and the reasons for it, should be notified to the Reporter at the earliest opportunity. Only in exceptional circumstances which could not reasonably have been foreseen, or in the case of public or other recognised local holidays, is a time limit likely to be extended.

20. The Reporter, where he/she considers it appropriate, may request one or more third parties to submit statements and documents to the Inquiry. In such circumstances the access authority will be asked to send additional copies of the objections and relevant documents to those third parties. For instance, third parties in this context might include the local access forum or bodies such as Scottish Natural Heritage who may have a relevant contribution to make. The Reporter will arrange for copies of any third party's statement to be sent to the access authority and to relevant objectors.

21. If the access authority or the objector(s) wishes to respond in writing to any aspect of such a third party's statement, this should be done within 2 weeks of the receipt of that statement. Copies of the response should be submitted to the Reporter, who will arrange for it to be copied to the other relevant parties.

22. All the above submissions and exchanges of documents should aim to utilise electronic format and transmission as far as is practicable, to make efficient use of time and resources. If the Reporter is not provided with the necessary information in sufficient time before the hearing it may cause delay or even deferral.

Site visits

23. The reporter will decide if a site visit is required. The purpose of the site visit, if required, is to familiarise the Reporter with the characteristics of the area in question, and to relate points raised in the submissions to the situation on the ground, once the written material has been submitted. Since most visits will involve footpaths accessible to the public and will not necessitate going on to private land, site visits will normally be carried out by the reporter unaccompanied. Where it is necessary for the visit to be accompanied, the relevant objector(s), the access authority and the landowner will be notified of the date and time of the visit and invited to attend.

Hearings procedure

24. It will be for the Reporter, on behalf of the Scottish Ministers, to decide whether a hearing would be an appropriate means of conducting the inquiry, based upon the Reporter's assessment of the submissions received. A hearing is likely to be used when there is particularly complex evidence which would benefit from oral discussion. The hearing may cover all the issues involved in a case, or may focus on specific issues where discussion would be helpful. The procedure is intended to allow the Reporter to lead a structured discussion about the matters at issue. The aim is to provide a fair hearing and to ensure the Reporter has all the information necessary for his/her report, in a flexible and less formal atmosphere.

25. If the Reporter decides that a hearing will be required, the objector and the access authority will be notified and given an opportunity to comment on the proposal to use the hearings procedure. Each party should, within 14 working days of that notification, inform the Reporter of their acceptance that the hearing procedure is appropriate.

26. If there are any additional documents to which parties, including any relevant third parties, intend to refer to at a hearing, copies should be submitted to the Reporter and to the other party or parties at least 4 weeks before the hearing is due to start.

Arranging the hearing

27. Not less than 4 weeks notice of the arrangements for the hearing will be given. The Reporter will send details of the arrangements to the objectors and the access authority. The hearing may use more than one venue during the course of the inquiry, and should be located to be convenient for the parties to the hearing. The Reporter will also give such other publicity to the hearing as he/she thinks advisable, and may provide information on where and when copies of any statements and documents that will be referred to during the hearing may be inspected.

28. The arrangements for the hearing and the conduct of it will be decided by the Reporter and designed to create the right atmosphere for discussion, and to eliminate or reduce the formality sometimes encountered at a local inquiry. To this end, the accommodation provided for the hearing should be informal and at a neutral venue, and the Reporter and the parties should wherever possible sit round a table. Small committee rooms are usually satisfactory, whereas council chambers, which often have a more formal atmosphere, should generally be avoided.

Procedure at the hearing

29. The Reporter will conduct the hearing, and at the outset explain that the hearing will take the form of a discussion which he/she will lead. The Reporter will then summarise his/her understanding of the relevant issues from reading the papers and any pre-hearing site visit, and will indicate those matters where further explanation, resolution or clarification is required. This will not preclude the parties from referring to other aspects which they consider relevant, provided that adequate prior notice and particulars have been given.

30. Written material should have been circulated and exchanged beforehand, and so it will not normally need to be read out at the hearing. Parties should avoid introducing new material or documents not previously referred to, as this may necessitate adjournment of the hearing to a later date and frustrate the objectives of the hearing procedure.

31. Objectors may present their case through an agent or advisor, but such representation is not essential. Legal representation should not normally be necessary at a hearing, and if proposed by any party should be notified to the Reporter and other parties in advance. The objector will usually be asked to start the discussion. Those participating in the hearing will have the opportunity to comment on the submissions made by other parties, and they will be able to ask questions informally (through the chair) throughout the proceedings, subject only to the questions being relevant and the discussion being conducted in an orderly manner. The Reporter will indicate when he/she considers that sufficient clarification of a topic has been achieved and will then move on to the next issue. The Reporter will also discourage repetitive or irrelevant evidence and questioning. The objector will be allowed to make any final comments before the discussion is closed (although formal closing submissions are not appropriate).

32. Before the end of the hearing the Reporter will consider whether there should be a visit to the site and will advise parties of the arrangements. If appropriate, he may decide to allow further limited discussion of relevant matters on site before formally closing the hearing.

Expenses

33. In general, parties are expected to meet their own expenses. The Act enables the Scottish Ministers to make orders relating to expenses, but these are likely to be awarded exceptionally, and probably only in cases where one party has acted unreasonably, and that unreasonable behaviour has demonstrably caused others to incur unnecessary expense.

Notification of decision

34. The Reporter will prepare a report and recommendation for the Minister who will subsequently notify all those who took part in the inquiry of his decision. As stated in the Act, after receiving the publication of the report by the person appointed to hold the inquiry, Ministers may (but need not) direct the access authority to adopt the core paths plan either as drawn up or with such modifications as Ministers may specify in the direction. It should be noted that any significant modifications may require to be reflected in adjustments to the Strategic Environmental Assessment which will accompany the core paths plan.

Contact

Email: ceu@gov.scot – Central Enquiry Unit

Phone: 0300 244 4000 – Central Enquiry Unit

The Scottish Government
St Andrew's House
Regent Road
Edinburgh
EH1 3DG

Back to top