Costs of St Andrew's House redevelopment: FOI release
- Published
- 11 October 2024
- Directorate
- Directorate for Corporate Transformation
- Topic
- Public sector
- FOI reference
- FOI/202400429946
- Date received
- 2 September 2024
- Date responded
- 30 October 2024
Information request and response under the Freedom of Information (Scotland) Act 2002.
Information requested
A breakdown of the costs of the wing that is under redevelopment in St Andrew's House.
I would like this to be broken down by each individual item with description and cost e.g. carpet -£X.
Please also provide design drawings for this space.
If this work was undertaken by any third parties, I would like to know the total costs payable to them as well.
Response
1. A breakdown of the costs of the wing that is under redevelopment in St Andrew's House.
2. I would like this to be broken down by each individual item with description and cost e.g. carpet -£X.
The pilot shared space project delivered in St Andrew’s House formed part of our aims to address accessibility issues in the building as part of meeting our legislative requirements, and provides shared workspace to maximise the use of the building.
The costs to undertake this work are detailed below:
SAH Pilot Project - Cost Breakdown |
||
|
|
|
Professional Fees |
Principal Designer, Architectural Services, M&E Consultants, Structural Engineer and Quantity Surveyor |
|
|
Total |
£76,499.43 |
Project Costs |
Description |
|
Contractor Preliminaries |
Site specific contractor overheads and profit |
£64,781.94 |
Strip Out/Downtakings |
Strip out and downtaking works, including removal of previous furniture. |
£24,522.21 |
Wall Finishes |
Decoration works to walls including acoustic panelling. |
£20,020.80 |
Floor Finishes |
Floor coverings, including preparation and underlays. Modifications to raised access floor. |
£47,974.01 |
Ceiling Finishes |
Decoration works to ceilings. |
£13,062.51 |
Fittings, Furniture & Equipment |
Accessible kitchen, light fixtures, acoustic curtain, signage, IT peripherals, desking, breakout furniture, collaboration furniture, pods, accessible pods. |
£367,658.59 |
Mechanical, Electrical & Plumbing |
Electrical upgrades, floorbox upgrades, data cabling, plumbing alterations, lighting, CO2 monitor, auto doors, fire alarm modifications |
£123,544.48 |
|
Total |
£661,564.54 |
|
|
|
|
Total Project Cost - Exc VAT |
£738,063.97 |
3. Please also provide design drawings for this space.
The design drawings for the space delivered in the building are provided in Annex A.
4. If this work was undertaken by any third parties, I would like to know the total costs payable to them as well.
The works were managed and delivered by Scottish Government’s Facilities Management Framework Contractor, Mite and the total costs paid to Mitie are broken down above.
About FOI
The Scottish Government is committed to publishing all information released in response to Freedom of Information requests. View all FOI responses at http://www.gov.scot/foi-responses.
- File type
- File size
- 32.5 kB
Contact
Please quote the FOI reference
Central Correspondence Unit
Email: contactus@gov.scot
Phone: 0300 244 4000
The Scottish Government
St Andrews House
Regent Road
Edinburgh
EH1 3DG
There is a problem
Thanks for your feedback