Publication - Factsheet

Low Carbon Infrastructure Transition Programme: capital projects - list

Published: 16 Nov 2020

A full list of capital projects supported under the Low Carbon Infrastructure Transition Programme (LCITP).

Published:
16 Nov 2020
Low Carbon Infrastructure Transition Programme: capital projects - list

The Low Carbon Infrastructure Transition Programme (LCITP), supported by the European Regional Development Funding (ERDF), is accelerating the development and delivery of low-carbon infrastructure projects across Scotland.

A full list of capital projects supported under the LCITP to date can be found below:

Project Title

Project Partners

Project Location

Project Summary

Funding Awarded

Project Status at November 2020

Blackwood Care Homes – Grey Fleet to Green Fleet

 

Blackwood Care Homes

FK7

Micro –energy system consisting of solar, battery and EV charging

£122,758

Operational

Fair Isle Unified Low Carbon, Electricity Storage and Generation Project

Fair Isle Electricity Company,
Scottish Water,
Fair Isle Bird Observatory,
Shetland Islands Council,
The National Trust Scotland

 

ZE2

The project installed a combination of wind turbines, solar arrays and battery storage. This is providing the Island with renewable, stable, 24 hour power for the first time.

£1,492,820

Operational

Tidal Energy Storage System

Nova Innovation

 

ZE2

Integration of Shetland tidal energy array with Tesla battery storage. delivering the world’s first grid-connected ‘baseload’ tidal power station

 

£268,606

Operational

Tackling Fuel

Poverty & Grid Balancing with

Smart Electric Storage Heat

 

Engie

V Charge

G21

The project installed VCharge smart technology units to existing storage heaters, which allowed heaters to be charged at different times based upon resident requirements.

 

£420,000

Operational

Glenrothes Energy Network

Fife Council,

RWE

KY7

 

The project constructed a heat network in Glenrothes, utilising the heat loss from the RWE Biomass CHP which had not previously been utilised.

 

£8,658,570                           

                           

Operational

Stirling Renewable Heat Demonstration Project

Stirling Council,

Scottish Water Horizons

FK7

Heat from waste water is harvested using a waste water heat recovery system. The system utilises electricity generated from the previously existing AD plant.

 

£2,005,331

Operational

Queens Quay and Clydebank Heating Network

West Dunbartonshire Council

G81

The project is using water source heat pumps in the River Clyde to create a heat network serving buildings at the Queens Quay development in Clydebank.

 

£6,100,000

Operational

Low Carbon District Energy Hub

Dundee City Council, Sportscotland, Leisure and Culture Dundee

 

DD4

A ground source heat pump and solar thermal array provides heat to the newly constructed Regional Performance Centre for Sport.

£3,000,000

Operational

Aqualibrium - Campbeltown

SHARC, Scottish Water Horizons

PA28

The project retrofitted the leisure centre at Campbeltown to utilise heat recovered from waste water.

 

£517,516

 

 

Operational

Clyde Gateway Heat

SHARC

G40

Water source heat pumps providing heat for buildings using waste water from the sewage.

 

£1,784,000

Not being progressed

Dundee and Angus Residual Waste Combined Heat and Power Project

 

 

Michelin Tyres,

MVV Environmental Services

DD4

The project installed a steam connection from the Energy from Waste plant to the Michelin factory.

£1,687,000

Commissioned

Millerhill Low Carbon District Heating Project

 

Midlothian Council

 

EH22

 

The project will create a low carbon heat network that serves the town of Shawfair, utilising heat from the Millerhill Energy from Waste plant.

 

£7,407,000

Pre-construction

Smart Solar and Storage Project

Aberdeenshire Council, Keir, Mitie Property Management Ltd, Everwarm Ltd, Bancon

Various locations with the Aberdeenshire Council Area

A battery, smart technology and PV will be installed at 500 Houses which will demonstrate  generation, storage and grid services across a large housing stock as a route to reducing carbon emissions.

 

£2,255,000

Installation

Biomass/Absorption Chilling Refrigeration Project

 

Mackies Ltd

AB51

The project uses a combination of a biomass boiler and an absorption refrigeration plant to chill milk, cream and freeze ice cream produce ice cubes.

 

£1,800,500

Construction

Aviva Low Carbon Transition Programme

Aviva

PH2

The project installed solar canopies and smart storage batteries at Aviva’s Offices in Perth. The energy will be used for EV Charging and building use.

 

£1,606,102

Operational

Grid Forming Algorithm Project

Scottish Power Renewables

KA6

The project used ‘grid-forming- technology called virtual synchronous machines (VSM) to regulation the frequency and voltage of the power from the turbines – essentially forming a stable network island to keep the electricity system stable and balanced. The technology was them used to integrate that supply with the grid and restore part of the system that had been blacked out. 

 

£547,000

Operational

Scottish Borders Council Vehicle Charging Infrastructure

Scottish Borders Council

TD6

 

 

Integrated energy system providing electric vehicle charging, photovoltaic generation and battery storage to SBC’s HQ and Depot in Newton St. Boswells.

 

£632,000

Pre- Construction

Fastned

Fastned

Various across Scotland

The project will develop, install and operate a network of electric vehicle charging stations with solar generation.

 

£1,037,875

Pre - Construction

Abbey Ecosse North Coast Energy Network

Abbey Ecosse

KW14

The project will construct a Low Carbon Energy System at Forss Energy and Business Park, consisting of an AD Plant, Biogas Engine, EV Charging and electrical storage with grid export.

 

£1,111,975

Pre - Construction

Energy Efficiency, Carbon Reduction

and Fuel Poverty Alleviation

NG Homes

G21

The project will install 6 air source heat pumps on 6 high rise building in Glasgow. An AI platform will monitor and report data on usage which will assist with residents who are vulnerable to fuel poverty.

 

£4,570,547

 

 

 

 

 

Construction

Glen Mhor Heat Network

Glen Mhor Hotel Limited

IV2

The project will use a wet well and water source heat pump to provide heat the Glen Mhor hotel and other connected buildings.

 

£825,000

 

 

Pre - Construction

Replacement Heating Project

Maryhill Housing

G20

The project will removing the existing all electric heating systems in 12 blocks of flats and replace them with individual air source heat pumps.

 

£1,538,799

 

 

                           

Pre-construction

 

 

                           

Glenmavis

North Lanarkshire Council

ML6

The project will install air source heat pumps with a PV array and battery, to provide space and water heating to 22 new build homes.

 

£192,060

Pre-construction

Firbush Outdoor Centre

Edinburgh University

EH8

The project will use a water source heat pump to provide space heating to the Firbush Outdoor Centre

 

£307,768

Pre-construction

 

Glenfield Low Carbon Heat Project

Graham’s Dairy

KY4

The project will create biogas from AD of the onsite whey, to create heat and power to be used and stored.

 

£1,072,649

Pre-construction

 

Blar Mhor

Highland Council

PH33

The project will use a combination of individual and clustered air source heat pumps, powered by solar arrays with storage batteries, to heat 117 new build houses.

 

£1,237,206

Construction

Torry Heat Network

Aberdeen City Council

AB12

The Torry Heat Network will supply heat from the Tullos Energy from Waste Plant to the Tullos School and social housing.

 

£5,900,000

Pre-construction

 

 

 

 

Total

£58,098,082

 