Annual running and maintenance costs for various Scottish Government premises: FOI release

Information request and response under the Freedom of Information (Scotland) Act 2002.


Information requested

The annual running costs for the following Scottish Government premises:

- Bute House
- St Andrew’s House
- Victoria Quay
- Saughton House
- Atlantic Quay

You also requested that the response include figures for the past five years (2020–2025) and account for maintenance and repair costs, gas and electricity bills, and other relevant expenses. If any of the buildings are leased, provide the monthly or annual fees for each year.

Response

The annual running costs for the 5 buildings you requested between 2020 and 2025 are shown in the following table:

Property: Bute House Planned Maintenance Costs (£) Repair Costs (£) Gas Costs (£) Electricity Costs (£) Water Costs (£) Rent (£)
FY 2020-2021 39,039.31 5,344.69 3,752.54 6,659.70 5,725.00 105,873.00
FY 2021-2022 41,635.42 10,786.88 3,889.03 8,385.82 5,389.30 105,900.00
FY 2022-2023 41,635.42 3,488.76 2,651.15 7,258.06 6,526.51 105,900.00
FY 2023-2024 44,270.95 9,632.78 12,382.10 17,234.37 6,307.75 105,900.00
FY 2024-2025 47,507.15 10,859.71 1,002.69 20,931.52 6,710.58 110,400.00
Property: St Andrews House Planned Maintenance Costs (£) Repair Costs (£) Gas Costs (£) Electricity Costs (£) Water Costs (£) Rent (£)
FY 2020-2021 660,792.46 53,310.08 70,176.39 135,097.89 63,535.17 -
FY 2021-2022 598,286.95 191,369.09 73,888.12 135,179.86 58,845.53 -
FY 2022-2023 638,073.03 130,684.84 187,192.09 165,197.90 72,663.56 -
FY 2023-2024 685,643.97 132,149.74 137,812.67 288,942.49 72,985.22 -
FY 2024-2025 735,764.54 240,721.33 140,534.11 311,775.96 76,013.57 -
Property: Victoria Quay Planned Maintenance Costs (£) Repair Costs (£) Gas Costs (£) Electricity Costs (£) Water Costs (£) Rent (£)
FY 2020-2021 1,192,137.00 75,169.08 49,033.24 237,567.26 52,052.11 -
FY 2021-2022 1,026,477.55 23,270.67 106,049.75 272,242.78 14,924.76 -
FY 2022-2023 1,094,738.31 38,435.54 270,229.38 449,351.85 25,355.21 -
FY 2023-2024 1,175,775.59 124,882.69 249,001.15 702,021.06 20,423.81 -
FY 2024-2025 1,261,724.79 151,367.43 241,853.35 715,749.72 23,275.50 -
Property: Saughton House Planned Maintenance Costs (£) Repair Costs (£) Gas Costs (£) Electricity Costs (£) Water Costs (£) Rent (£)
FY 2020-2021 726,352.19 409,722.86 38,668.04 165,985.28 45,006.46 192,000.00
FY 2021-2022 562,897.34 334,363.80 52,364.35 160,967.34 31,378.33 192,000.00
FY 2022-2023 600,330.01 183,768.73 135,303.09 198,972.74 38,312.85 192,000.00
FY 2023-2024 644,450.31 130,557.29 105,268.09 350,070.94 41,312.50 192,000.00
FY 2024-2025 691,559.63 144,943.77 123,669.32 387,401.97 38,302.98 192,000.00
Property: 5 Atlantic Quay Planned Maintenance Costs (£) Repair Costs (£) Gas Costs (£) Electricity Costs (£) Water Costs (£) Rent (£)
FY 2020-2021 488,620.00 39,645.71 35,361.30 137,125.77 39,925.00 3,145,744.00
FY 2021-2022 330,259.79 22,744.02 43,458.63 184,587.99 45,028.60 3,145,744.00
FY 2022-2023 352,222.07 75,111.47 122,690.05 277,137.39 49,114.71 3,145,744.00
FY 2023-2024 378,860.65 67,351.87 99,913.38 459,258.00 60,150.07 3,341,125.00
FY 2024-2025 406,555.36 107,105.22 117,319.08 574,280.95 62,551.79 652,255.00

Notes:
Planned Maintenance is maintenance work that is scheduled in advance, based on known asset needs, manufacturer recommendations, statutory requirements, or risk-based planning.

Repair Costs are the expenses incurred to restore an asset, system, or building component to normal operation after a fault, breakdown, or deterioration has occurred. They arise from unplanned or reactive maintenance activities.

Utility costs covering gas, electricity, and water, are the expenses incurred from using the essential services required to keep a building operational. These costs stem from the consumption of energy, water, and other core utilities that ensure the building’s functionality, comfort, and regulatory compliance. This request dates back to the Covid lockdown period, when buildings were largely unoccupied and electricity and gas usage dropped significantly. Energy costs associated with IT Data Centre equipment, incurred on behalf of the wider Scottish Government, are invoiced to Saughton House; however, because these costs do not relate to the building’s operational needs, they have been excluded from the figures presented.

Rental Costs are the expenses incurred for leasing the building or specific areas within the facility. They cover the baseline cost of occupying space and form a major component of overall estate operating expenditure, separate from service delivery costs. St Andrews House and Victoria Quay are rent free as they are owned by the Scottish Government.

About FOI

The Scottish Government is committed to publishing all information released in response to Freedom of Information requests. View all FOI responses at https://www.gov.scot/foi-responses.

Contact

Please quote the FOI reference
Central Correspondence Unit
Email: contactus@gov.scot
Phone: 0300 244 4000

The Scottish Government
St Andrew's House
Regent Road
Edinburgh
EH1 3DG

Back to top