Habitats Regulations Appraisal of Draft Plan for Offshore Wind Energy in Scottish Territorial Waters: Pre-Screening Review of the Medium Term Options

DescriptionHabitats Regulations Appraisal of Draft Plan for Offshore Wind Energy in Scottish Territorial Waters: Pre-Screening Review of the Medium Term Options
ISBN978 1 78045 058
Official Print Publication DateMarch 2011
Website Publication DateMarch 08, 2011

Listen

ISBN 978 1 78045 058 2 (Web only publication)
DPPAS 11359

This document is also available in pdf format (4.8mb)

Contents

Summary

Abbreviations

1. Introduction
1.1 Report Background
1.2 Objectives of Pre-Screening and Report Structure

2. Offshore Wind Energy ( OWE) Options
2.1 Background to Draft Plan
2.2 Medium Term Options

3. OWE Strategic Environmental Assessment

4. Habitats Regulations Appraisal
4.1 Legislative Background
4.2 HRA Framework and Approach for Plans

5. HRA Stages 1 to 3 and 5
5.1 Introduction and Scope
5.2 Stage 1 - Deciding Whether the Draft Plan is Subject to HRA
5.3 Stage 2 - Identifying the European/Ramsar Sites that Should be Considered in the Appraisal
5.4 Stage 3 - Gathering Information About the European/Ramsar Sites
5.5 Stage 5 - First Phase of Screening for LSE

6. Summary and Next Stage of the HRA

7. References

Appendix
A. Pre-Screening Tables (now superseded by Appendix A of the Appropriate Assessment Information Report)

Tables
1. Medium term options for offshore wind energy
2. Is the Draft Plan for medium term OWE options subject to HRA?

Report Text Image
1. Key Stages of HRA Process for Plans

Figures
1. Medium term options (areas of search) from the Offshore Wind Energy draft plan
2a. Location of all designated SPA sites within and surrounding the medium term option areas
2b. Location of all designated SAC sites within and surrounding the medium term option areas
2c. Location of all designated Ramsar sites within and surrounding the medium term option areas

Date: January 2011
Project Ref: R.3974/1
Report No: R.1722a
© ABP Marine Environmental Research Ltd

Version

Details of Change

Authorised By

Date

1

Draft for Comment

E San Martin

01/11/10

2

Second Draft

E San Martin

22/11/10

3

Final Draft

E San Martin

07/01/11

4

Final

E San Martin

21/01/11

Document Authorisation

Signature

Date

Project Manager:

E San Martin

E San Martin signature

21/01/11

Quality Manager:

C R Scott

C R Scott signature

21/01/11

Project Director:

S C Hull

S C Hull signature

21/01/11

ABP Marine Environmental Research Ltd

Suite B, Waterside House
Town Quay
SOUTHAMPTON
Hampshire
SO14 2AQ