Scottish Flood Defence Asset Database Final Report

Listen

APPENDIX A: SCHEME LISTS

Proposed Schemes

There are 47 proposed schemes described in the biennial reports.

Table A- 1: Proposed Flood Prevention Schemes

Local Authority

Location

Status

Aberdeenshire Council

Tarland Burn

Bid for funding under preparation

Angus Council

River South Esk at River Street, Brechin

FPS programmed 2005

Angus Council

Tayock Burn, Montrose

Design stages

Argyll & Bute

Kilbride Road

Consultation stage. Programmed for confirmation of FPS in 2005

Argyll & Bute

Milton Burn

Consultation stage. Programmed for confirmation of FPS in 2006/7

City of Edinburgh

Water of Leith and Braid Burn Schemes

Planning stages

Glasgow City Council

White Cart Water

FPS made 2004, Scottish Executive confirmation being sought

Glasgow City Council

River Clyde

River Clyde Flood Management Strategy undertaken (programmed for completion 2005) with view to promoting one or a number of FPS

Dumfries and Galloway

Portpatrick Flood Prevention Scheme

Construction completed end of 2005

Dumfries and Galloway

Moffat

Feasibility study complete 2005

Dumfries and Galloway

Stranraer

FPS scheme preparation underway.

Fife Council

Dunfermline

At statutory consent stage.

Highland

River Ness

Pre-feasibility flood protection study completed June 2005, recommending FPS is progressed

Highland

Aviemore

Programmed for 2004/2005. Draft FPS received objections. Yet to progress further

Highland

Kingussie

Programmed for 2004/2005. Revised FPS under consideration

Highland

Acharacle

Design stage

Highland

Inverness, Smithton, Culloden and Balloch

Design stage

Highland

Glencoe

Not progressed from 2001

Highland

Fort William

Not progressed from 2001

Highland

Inverness Ness Bank

No progress due to objections

Highland

River Enrick and River Coiltie

Now progressing under EU funded SAFER project (Strategies and Actions/Implementations for Flood Emergency Risk Management)

Highland

Dell/Inshes Burn and Cradlehall & Culloden Burns

Preparations for FPO ongoing

Highland

Minor flood prevention in Portree

Application stages

Inverclyde

Larkfield Road

No information

Inverclyde

Kirn Drive

No information

Moray

Elgin

Design stage

Moray

Lhanbryde

Construction completed 2005

Moray

Forres

Design stage

Moray

Rothes

Design stage

North Ayrshire

Kilbirnie & Glengarnock

Feasibility stage

Perth and Kinross

Birnam

Scheme drawings being prepared

Perth and Kinross

Milnathort

Tender stage

Perth and Kinross

Dalginross

Drawings complete, cost benefit study currently being undertaken

Perth and Kinross

Almondbank

FPS scheme drawings currently being put together

Perth and Kinross

Alyth

Possible FPS awaiting funding

Perth and Kinross

Earnbank and Weem Village Flood Prevention Schemes

Tender stage

Stirling Council

Meadows Car Park, Callander

Detailed assessment programmed for 2003/04

Renfrewshire Council

Hawkhead Burn and Todd Burn in White Cart catchment

Flood Prevention Schemes identified

Renfrewshire Council

Black Cart catchment

Flood Prevention Schemes identified

Renfrewshire Council

River Clyde and Mill Burn

Promotion of FPS underway. Submission to Scottish Executive for confirmation programmed 2006

Stirling Council

B829 Loch Ard Road by Aberfoyle

Flood alleviation proposal for road being developed

Stirling Council

Mill Row, Dunblane

To be assessed in 2003/04

Stirling Council

Fire Station Wall, Bridge of Allan

To be assessed in 2004/05

Stirling Council

Car Park, Aberfoyle

Detailed assessment programmed for 2003/04

West Dunbartonshire Council

River Leven

Flood risk study completed. Promotion of FPS intended

West Dunbartonshire Council

Gruggies and Knowle Burns

First stage investigation completed. Promotion of FPS intended.

West Lothian Council

Broxburn

Catchment study completed. Promotion of FPS intended.

Categorisation of Schemes

The schemes were prioritised on the following criteria:

  • Category A -schemes were established as very recent scheme with large amounts of information available and there was normally enough information to be used to complete the database, without further study.
  • Category B - schemes with some information and a reasonable likelihood of protecting properties. More detailed studies were undertaken on the majority of these schemes.
  • Category C - little or no information (usually name and location only). The location was confirmed and any information available entered into the database.
  • Category D - scheme name only. For these schemes the existence of the scheme was confirmed with the local authority and this information entered into the database.

Table A- 2: Scheme Prioritisation List

Scheme Name

Category

Collier Street Renfrew, Johnstone

A

Fraser Road, Aberdeen

A

Linlithgow, Linlithgow

A

Perth - Bridgend, Perth

A

Perth - Inveralmond, Perth

A

Perth - Lower City Mills, Perth

A

Perth, Perth

A

River Kelvin, Glasgow

A

Rothesay, Rothesay

A

Water of Leith (Roseburn), Edinburgh

A

Aberlour, Aberlour

B

Arbroath (Brothock Water), Arbroath

B

Auchtermuchty, Auchtermuchty

B

Barry Burn, Carnoustie, Carnoustie

B

Bridge of Allan, Bridge of Allan

B

Bridge of Earn, Bridge of Earn

B

Brock Burn & Levernwater, Glasgow

B

Cairneyhill, Cairneyhill

B

Ceres, Ceres village

B

Conon Bridge, Conon Village

B

Crosslee, Crosslee

B

Dalbeattie, Dalbeattie and Kirkgunzeon

B

Denholm, Denholm

B

Dunshalt, Dunshalt

B

Earnhill Road, Gourock, Gourock

B

Ettrick Yarrow Water, Ettrick

B

Fettercairn, Fettercairn

B

Fort Augustus, Fort Augustus

B

Galashiels - Netherdale, Galashiels

B

Galashiels - Plumtree Wilderhaugh, Galashiels

B

Innerleithen Hall Street, Innerleithen

B

Inverurie (Strathburn and Over Burn), Inverurie

B

Jed Water, Jedburgh

B

Jedburgh Skiprunning Burn culvert, Jedburgh

B

Kilmarnock, Hurlford & Kilmarnock (Galston and Crookedholm and Riccarton)

B

Kincardine on Forth, Kincardine

B

Kirriemuir (Gairie Burn), Kirriemuir

B

Largs, Largs

B

Lauder Station Yard, Lauder

B

Lennoxtown, Lennoxtown

B

Millfield Cupar, Cupar

B

Moredun Playing Field, Paisley

B

Overburn Culvert, Inverurie, Inverurie

B

Peebles Southpark Area, Peebles

B

Pitscottie, Pitscottie

B

Port Logan, Port Logan

B

Prestonpans, Prestonpans

B

River Ness, Inverness

B

Rullion Road Penicuik, Penicuik

B

Turfford Burn, Earlston

B

Well Road Moffat, Moffat

B

Bank of Rothes Burn, Rothes

C

Cochno Burn, Clydebank

C

Craigieknowe Burn, Barnbarroch

C

Dingwall

C

Elgin Waterside Street, Elgin

C

Gartmorn Road, Sauchie, New Sauchie

C

Glazertbank, Lennoxtown, Lennoxtown

C

Glengarnock, Glengarnock

C

Grange Burn, none

C

Grangeburn Road, Grangemouth

C

Kirkcolm

C

Kirkinner

C

Mochrum

C

North Muirtar,

C

Parkneuk Dunfermline

C

Powerburn, Kirkconnel

C

River Coilty,

C

Southerness

C

Springholm

C

Tyock Burn, Elgin

C

Whithorn

C

Yoker Burn,

C

a) Category A -schemes were established as very recent scheme with large amounts of information available and there was normally enough information to be used to complete the database, without further study.
b) Category B - schemes with some information and a reasonable likelihood of protecting properties. More detailed studies were undertaken on the majority of these schemes.
c) Category C - little or no information (usually name and location only). The location was confirmed and any information available entered into the database.
d) Category D - scheme name only. For these schemes the existence of the scheme was confirmed with the local authority and this information entered into the database.

Standard of protection and options for improvement summary

Table A- 3: Summary of standard of protection and options for improvement

Local Authority

Flood Prevention Scheme

Design return period

SOP return period

Onset of Flooding return period

Recommendations

Work complete or required

Aberdeen City Council

Fraser Road

100

100

100

Meets Standard

Aberdeenshire

Fettercairn

20

2

10

Under detailed review

Angus

Arbroath

25

5

10

Recommendations include maintenance, local raising and consideration of upstream storage

A number of storage options have been considered and one looks promising

Angus

Carnoustie

100

10

75

Options included raising and storage

Defences have been restored to original levels ( SOP currently 200yr)

Angus

Kirriemuir

-

10

10

Recommendations include restoring original defences

Upstream storage is an option Council may consider most viable option

Argyll & Bute

Rothesay

100

100

100

Meets Standard

Dumfries & Galloway

Dalbeattie

80

5

100

Maintenance recommendations

Defences could be raised locally or other flood management options used

Dumfries & Galloway

Port Logan

200

200

200

Meets Standard

Need for occasional CCTV, inspection. Also inspection of neighbouring watercourse which could also cause flood risk in area

East Ayrshire

Kilmarnock

100

100

100

Meets Standard

East Dunbartonshire

Lennoxtown (Rannie Burn)

-

<2

<2

The scheme uses another pipe that is not defined which improves performance

Need to check additional pipe, could also consider upstream storage. Schemes sensitive to screen blockage

East Dunbartonshire

River Kelvin

100

100

100

Meets Standard

East Lothian

Prestonpans

-

200

200

Meets Standard

Hole in wall repaired

Fife

Auchtermuchty

50

2

5

Could raise defences locally, remove sediment, replace missing defences and fill in gaps

Fife

Cairneyhill

50

2

2

Needs maintenance to avoid blockage and raised levels on river bank would lower risk

Fife

Ceres

100

200

200

Meets Standard

Fife

Kincardine

50

5

25

Fife

Millfield Cupar

100

200

200

Meets Standard

Needs maintenance, also land levels could be altered to make sure storage areas performs as designed.

Fife

Pitscottie

100

30

50

Embankments could be raised locally

Glasgow City

Brock Burn & Levernwater

100

200

200

Meets Standard

Check that work by developer that modifies FPS maintains FPS performance

Highland

Conon Bridge

100

25

200

Some work on Connon embankments required. The Eil burn is undefended

Would benefit from a gauge that would improve flood warning and flow estimates. Eil Burn poses continued flood risk

Highlands

Fort Augustus

100

25

100

Strengthen and raise embankment if freeboard required

Inverclyde

Gourock

200

<2

<2

Ideally requires CCTV inspections

Could benefit from upstream storage

Moray

Aberlour

-

200

200

Meets Standard

Maintenance to keep screens clear

North Ayrshire

Largs

250

250

250

Meets Standard - needs a check to assess revised flows do not exceed critical bank levels

Check of FEH flows undertaken and indicates that standard is achieved

Perth & Kinross

Bridge of Earn

100

2

30

Number of maintenance recommendations

Likely solution is to raise defences

Perth & Kinross

Perth

250

250

250

Meets Standard

Renfrewshire

Collier Street

200

1000

1000

Meets Standard

Gabions require regular inspection

Renfrewshire

Crosslee

100

30

50

Confirm standard of protection - resurvey channel

Renfrewshire

Moredun

100

200

-

Meets Standard

Assessment of benefit to downstream areas required

Scottish Borders

Denholm

50

5

5

upstream storage would be feasible

Scottish Borders

Galashiels - Netherdale

30

50

50

Review options for improvement

Review complete- possible to upgrade scheme

Scottish Borders

Galashiels - Plumtree

30

25

30

Review options for improvement

Review complete- possible to upgrade scheme

Scottish Borders

Innerleithen

10

5

5

Possible to upgrade scheme through storage

Scottish Borders

Lauder

-

10

50

Possible to upgrade scheme through storage

Scottish Borders

Peebles

50

5

5

Review options for upstream storage and culvert replacement

Under review

Scottish Borders

Skiprunning Burn

500

75

75

In stream screens and vegetation management

Improved telemetry installed

Scottish Borders

Jedburgh

30

-

100

May need holistic review of town

Review complete weir lowering would lower flood risk

Scottish Borders

Turfford Burn

-

<2

<2

Local headwall improvements would improve standard to 5 year, but would need large scale works. Probably better to review flood risk in Lauder as a whole as largest area of risk at Leader Water.

Stirling

Bridge of Allan

100

5

25

Number of maintenance recommendations including increasing defences locally

West Lothian

Linlithgow

120

200

200

Meets Standard

Need to check overland flow risk